Browse
Search
2020-224-E DEAPR - Hardscapes Efland Cheeks court resurface
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-224-E DEAPR - Hardscapes Efland Cheeks court resurface
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 3:52:17 PM
Creation date
3/27/2020 5:47:38 PM
Metadata
Fields
Template:
Contract
Date
3/10/2020
Contract Ending Date
6/30/2020
Contract Document Type
Agreement - Construction
Amount
$116,514.00
Document Relationships
R 2020-224 DEAPR - DEAPR - Hardscapes Efland Cheeks court resurface
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8612D7F4-70A0-4E82-988A-C78BD9FFB97A <br /> SPEC HC <br /> ARCHITECTURAL SPECIFICATIONS FOR <br /> SUSPENDED MODULAR TILE SPORTS FLOOR SYSTEM <br /> SECTION 09771- ATHLETIC SURFACING — INDOOR/OUTDOOR - <br /> SUSPENDED <br /> PART 1 — GENERAL <br /> 1.01 DESCRIPTION <br /> A) Scope <br /> 1. The furnishing of interlocking suspended synthetic (high impact <br /> polypropylene copolymer proprietary formulation) modular tile <br /> system. <br /> 2. Game lining. <br /> 1.02 RELATED WORK SPECIFIED ELSEWHERE <br /> A) Installation of concrete, bituminous or wood substrate. <br /> B) Preparation of substrate to provide a medium, dense finish with level <br /> tolerance of (+) or (-) 1/8 inch in any ten-foot radius. <br /> C) Substrate shall be free of any debris before modular tiles are installed. <br /> 1.03 QUALITY ASSURANCE <br /> A) Acceptable Manufacturer: <br /> 1. The manufacturer shall be a firm experienced in the manufacturing <br /> of interlocking suspended synthetic floor systems for over 20 years. <br /> B) Acceptable Installer: <br /> 1. Flooring contractor shall be a firm experienced in the flooring field <br /> and approved by the manufacturer. <br /> C) Warranty: <br /> 1. Manufacturer's 15 year limited warranty on materials. <br /> 1.04 SUBMITTALS <br /> A) Submit samples of the actual sports surface in the standard color and <br /> manufacturers literature. <br /> 1.05 DELIVERY AND STORAGE <br /> A) Material shall not be installed until all masonry; painting, plastering tile <br /> work, marble, and terrazzo are complete to ensure cleanliness. <br />
The URL can be used to link to this page
Your browser does not support the video tag.