Browse
Search
2020-213-E Planning - In Water Services gate stem
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-213-E Planning - In Water Services gate stem
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 2:51:38 PM
Creation date
3/27/2020 5:41:53 PM
Metadata
Fields
Template:
Contract
Date
3/20/2020
Contract Starting Date
3/20/2020
Contract Ending Date
6/30/2020
Contract Document Type
Agreement - Services
Amount
$6,498.00
Document Relationships
R 2020-213 Planning - In Water Services gate stem
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2E2387F3-3A58-44C5-A8FF-30C659A8AB71 <br /> [Departmental Use Only] <br /> TITLE L.O.GateStemGuides <br /> FY 19-20 <br /> NORTH CAROLINA <br /> SERVICES AGREEMENT NO RFP/RFQ <br /> ORANGE COUNTY <br /> This Services Agreement (hereinafter "Agreement"), made and entered into this 20th day of <br /> March, 2020, ("Effective Date") by and between Orange County, North Carolina a political <br /> subdivision of the State of North Carolina (hereinafter, the "County") and In-Water Services <br /> Company, Inc., (hereinafter, the "Provider"). <br /> WITNESSETH: <br /> That the County and Provider,for the consideration herein named,do hereby agree as follows: <br /> 1. Services <br /> a. Scope of Work. <br /> i) This Agreement is for services to be rendered by Provider to County with respect <br /> to(insert type ofproject): Fabrication and installation/testing of four(4)new sluice <br /> gate stem guides for the primary drain gate within the Lake Orange intake tower. <br /> ii) By executing this Agreement, the Provider represents and agrees that Provider is <br /> qualified to perform and fully capable of performing and providing the services <br /> required or necessary under this Agreement in a fully competent, professional and <br /> timely manner. <br /> iii) Time is of the essence with respect to this Agreement. <br /> iv) The services to be performed under this Agreement consist of Basic Services, as <br /> described and designated in Section 3 hereof. Compensation to the Provider for <br /> Basic Services under this Agreement shall be as set forth herein. <br /> 2. Responsibilities of the Provider <br /> a. Services to be provided. The Provider shall provide the County with all services required <br /> in Section 3 to satisfactorily complete the Project within the time limitations set forth <br /> herein and in accordance with the highest professional standards. <br /> b. Standard of Care. <br /> i) The Provider shall exercise reasonable care and diligence in performing services <br /> under this Agreement in accordance with the highest generally accepted standards <br /> of this type of Provider practice throughout the United States and in accordance <br /> with applicable federal, state and local laws and regulations applicable to the <br /> performance of these services. Provider is solely responsible for the professional <br /> Revised 11/19 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.