Orange County NC Website
DocuSign Envelope ID: DBD4F70A-57A3-43CD-AB8F-E2A7225A7AD9 <br /> Proposal for Engineering Services <br /> Orange County Sportsplex Main Building Roof Replacement <br /> Prepared for Orange County Asset Management Services <br /> Prepared by Atlas Engineering-Project No.:J2400 <br /> December 9,2019-Page 3 <br /> Drawings and specifications will not be submitted at this phase, however, meeting <br /> minutes to document items discussed and selections made will be provided by Atlas <br /> Engineering for the project record. The replacement roof system(s)and bid alternates, <br /> as applicable, must be agreed upon by Atlas and the Owner prior to development of <br /> the Construction Documents. <br /> 4. Construction Documents (75%): Schedule a conference call with the Owner's <br /> representative(s) when we are 75% complete with construction documents to discuss design <br /> progress and to follow-up on any questions or concerns that have arisen during the design <br /> process. <br /> • Atlas will provide an informal submittal of cover sheet with building code summary, <br /> roof plans,front end documents,and Division 1 of the project manual to the Owner no <br /> less than 5 business days prior to the conference call for the purpose of review and <br /> discussion. <br /> • Atlas will provide a revised cost estimate for the project based for review by the County <br /> and to confirm that adequate budget is available. <br /> 5. Construction Documents (100% and Bid Documents): Submit Construction Documents <br /> (100% completion) for review by the Owner and any required regulatory agencies. <br /> • Design documents will include front end documents,complete technical specifications, <br /> and design drawings. <br /> • The design of the replacement roof system(s)will address wind uplift resistance, roof <br /> primary and secondary drainage requirements, roof thermal resistance, roof deck <br /> inspection and repair,insulation types and attachment methods,roof membrane/system <br /> types and attachment methods, repair materials and work sequence, and system <br /> warranty requirements to meet or exceed applicable building code and industry <br /> standard criteria. <br /> • Owner review comments from the 75%Construction Documents will be discussed and <br /> incorporated into the 100%Construction Document package. <br /> • 100% Construction Documents would be acceptable for submittal to the County <br /> Permitting Office. <br /> • Submit Bid Documents for the roof replacement project. Owner review comments <br /> from the 100% Construction Documents will be incorporated into the 100% <br /> Construction Document package. <br /> • Bid Documents will be signed and sealed by a Professional Engineer registered in the <br /> State of North Carolina and a Registered Roof Consultant(IIBEC-certified RRC). <br /> • Bid Documents will be acceptable for use in obtaining competitive bids for the work <br /> in accordance with the North Carolina General Statutes. <br /> Bidding and Contract Award <br /> 6. Provide an Advertisement for Bids for public advertisement. If publicly advertised, <br /> Advertisement for Bids will be sent to public electronic plan rooms and newspaper(s) (if <br /> requested by the Owner). Public advertising costs will be paid by the Owner directly to the <br /> newspaper or through reimbursement to Atlas if preferred by the Owner. <br /> 7. Distribute Bid Document Sets to known, qualified, or interested Bidders and maintain a <br /> document distribution list. <br />