Browse
Search
Agenda - 06-14-2001-2b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 06-14-2001
>
Agenda - 06-14-2001-2b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:39:41 PM
Creation date
8/29/2008 10:32:53 AM
Metadata
Fields
Template:
BOCC
Date
6/14/2001
Document Type
Agenda
Agenda Item
2b
Document Relationships
Minutes - 06-14-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Approved 4/20/99 <br />Cost per. Square Foot <br />$110 per square foot for construction is the 1998 assumed cost of high school construction. Prevailing <br />mazket factors, inflationary impacts, and the use of alternative design such as the unitary systems <br />approach should be factored in, as appropriate far future high school planning. . ' <br />Other Facility Considerations <br />1. Technology Infrastracture <br />The State Department of Public Instruction encourages school systems to install up-to-date technology <br />infrastructure for use by all students, faculty, and staff. -When funds aze not available for the <br />installation of complete systems, the State recommends that school systems provide empty conduits <br />and cable trays. In addition, space should also be allocated for local and wide area networks, file <br />servers and other equipment. Wiring closets may be replaced with fiber-optic cable. 'This may be a <br />more cast efficient manner to provide connectivity. <br />For. planning purposes, the Department of Public Instruction suggests a cast allowance for technology <br />infrastructure of $8.25 per building squaze footage. This is consistent with the construction standazds <br />adopted for elementary and middle schools in Orange County. <br />2. Energy Efficiencies <br />During the planning process, special attention should be given to creating fiscally sound energy <br />efficiencies, Ways to achieve this include: ~ _ <br />Choosing efficient lighting systems and energy management controls, <br />Considering solar orientation, earth integration, and plantings and landscaping in <br />• siting the facility, • <br />• Selecting energy efficient heating, ventilation, and air conditioning system_ s; and <br />• Exploring solaz energy including day lighting and passive solar heating. <br />Life cycle cost analyses should be used. when choosing energy systems. • Appendix•D provides further <br />detail as presented bythe County Engineer to the High School Construction Standazds Task Force. <br />.,, <br />3. Materials <br />Construction materials should be selected based on low maintenance and high durability. The <br />presumed life cycle of each new high school is a minimum of fifty years, <br />
The URL can be used to link to this page
Your browser does not support the video tag.