Browse
Search
Agenda - 06-14-2001-2b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 06-14-2001
>
Agenda - 06-14-2001-2b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:39:41 PM
Creation date
8/29/2008 10:32:53 AM
Metadata
Fields
Template:
BOCC
Date
6/14/2001
Document Type
Agenda
Agenda Item
2b
Document Relationships
Minutes - 06-14-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D-19 <br /> Estimated Cost of New Facilities . <br />Elementary School Capacity =600 students Square Footage 95 225 <br /> Square Ft. per Student 188.7 . <br />COtistructian COSt Cost Per Square Faot $ 90 $ 8,570,250 <br />Site Acquisition ,Acres:, 16 <br /> Average Cost Per Acre: 25,000 $ 400,000 <br />Site Development As a percentage of Construction Cost 109b $ 857,025 <br />Fees As a percentage of Construction Costs and Site Development 1p%, 942,728 <br />Moveable Equipment As a percentage of Construction Cost ~ 5 % $ 428,513 <br />Technology Cost per square foot ~ $ 8:25 $ 785,606 <br />(includes cabling and equipment for voice, video and data distribution systems) <br />Construction Contingency As a percentage of Construction Cost and Site Development 5Ro $ 471,364 <br />Start-Up Costs Non Personnel One time start-up costs $ 330,000 <br /> Total $ 12,785,485 <br /> <br /> ,,', <br />~:~;: <br />Middle School Capacity = 700 students Square Footage ~ 132 192 <br /> Square Ft. per Student 188.8 . <br />Construction Cost Cost Per Square Foat ~ $ 95 $ 12,558,240 . <br />Site Acquisition Acres: 22 <br /> Average Cost Per Acre 25,000 $ 550,000 <br />Site Development As a percentage of Construction Cost 10%~ $ 1,255,824 <br />Fees - . As a percentage of Construction Costs and Site Development 10% 1,381,406 <br />Moveable Equipment As a percentage ~of Construction Cost 5 ~ $ 627,912 <br />Technology Cost per square foot _ $ 8.75 $ 1,090,584 <br />~ ('includes cabling anaf equipment for voice, video and data distribution systems) <br />Construction Contingency As a percentage of Construction Cost and Site Development ~ 5%~ $ 690,703 <br />Start-Up Casts Non Persotmel Start Up =one time $ 350,000 <br /> Total $ 18 504,670 <br />R <br />
The URL can be used to link to this page
Your browser does not support the video tag.