Browse
Search
Agenda - 06-14-2001-2b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 06-14-2001
>
Agenda - 06-14-2001-2b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 3:39:41 PM
Creation date
8/29/2008 10:32:53 AM
Metadata
Fields
Template:
BOCC
Date
6/14/2001
Document Type
Agenda
Agenda Item
2b
Document Relationships
Minutes - 06-14-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b-8 <br />.preparing 7S0 meals should be at least 1,93$ square feet. The adopted standards include a <br />dining azea of 2,400 square feet and akitchen/serving area of 2,100. <br />Tier B includes additional storage for tables and chairs totaling 200 squaze feet. <br />12. Miscellaneous/Commons <br />Basic School -13,00 sq. ft. <br />Tier B -Add 1,855 sq, ft. <br />This area includes miscellaneous space such as additional storage, book storage and <br />School Commons area. In addition, this area includes additional toilets which are <br />required by the State Facility Standazds but are calculated as part of the overall <br />circulation multiplier which is applied to the total square footage (see next section). <br />Locad Basic Standards. - NC Public School Facility <br />(Sq. Ft) Standards (Sq. Ft). <br />CustodiaX Storage 500 500 <br />. Book Storage $00 ~ SOO <br />Tier B includes a Commons area (1,000 sq. ft.) and toilets which are calculated over and <br />above the circulation factor of 33 percent. <br />13. Circulation <br />A multiplier of 33 percent is included for space such as storage, mechanical rooms, <br />hallways, toilets, walls, etc. The multiplier is applied to the total square footage of the <br />Basic. School plus each additional level. <br />14, Cost Per Square Foot. <br />For planning purposes, building costs aze calculated based an $90 per square foot for <br />construction. <br />Maiddle School <br />The total squaze footage of the Basic School, as outlined in this section of the report, is <br />approximately 113,400 square feet. There aze two added to the Basic School.. Tier A includes <br />increased space for the afterschool programs, increasing the squaze footage by a total of 1,620 <br />square feet. The remaining tier includes nearly 17,200 square feet of which a large portion is for <br />special project rooms, additional commons space and additional teacher workspace. <br />
The URL can be used to link to this page
Your browser does not support the video tag.