Browse
Search
2020-193-E AMS - Summit Parking deck design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-193-E AMS - Summit Parking deck design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:50:26 AM
Creation date
3/27/2020 5:30:22 PM
Metadata
Fields
Template:
Contract
Date
2/27/2020
Contract Starting Date
2/27/2020
Contract Document Type
Agreement - Services
Amount
$14,760.00
Document Relationships
R 2020-193 AMS - Summit Parking deck design
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 13777B3D-11F6-48F1-9874-3B94A8B30810 <br /> USUMMIT 1110 Navaho Drive, Suite 600, Raleigh, NC 27609 <br /> DESIGN AND ENGINEERING SERVICES Phone // 919.322.0115 Web // www.summitde.net <br /> February 17, 2019 <br /> Ms. Angel Barnes <br /> Capital Project Manager <br /> Orange County Asset Management Service <br /> 600 Hwy 86N <br /> Hillsborough, NC 28278 <br /> Re: Gateway Center Parking Deck Repair Plan <br /> Hillsborough, NC <br /> Dear Ms. Barnes: <br /> We appreciate you contacting Summit Design and Engineering Services, PLLC regarding this <br /> project. Summit recently completed Phase 1 of proposed services for this project which <br /> consisted of the field evaluation of the parking deck. Based on coordination during the <br /> completion of Phase 1, we understand that you wish to retain an engineering firm to provide <br /> design services related to the repair of this parking deck and provide construction <br /> administration services, noted as Phase 2 below. <br /> Based on this, SUMMIT proposes providing the following services to Orange County: <br /> Phase 1 - Field Evaluation Phase (Completed) <br /> 1. Review any existing facilities drawings <br /> 2. Prepare and execute a field inspection program to walkthrough the entirety of <br /> the facility, visually observing the facility for areas of damage or deterioration <br /> 3. Perform selective "chain drag" testing of any area of delamination concern. <br /> 4. Submit an engineering report detailing our findings to the County, which will <br /> include: <br /> a. An assessment of current conditions <br /> b. Recommended repairs for short and long term <br /> c. A proposed maintenance plan <br /> d. Budgetary probable construction cost for the necessary repairs. <br /> Phase 2 - Design Phase <br /> 5. Meet with the county to discuss and determine the scope of repair items to be <br /> included in a set of construction documents for the deck repairs <br /> 6. Prepare construction documents and specifications for the repair scope <br />
The URL can be used to link to this page
Your browser does not support the video tag.