Browse
Search
2020-176-E AMS - Sasser Hillsborough Commons DSS Water Heater leak remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-176-E AMS - Sasser Hillsborough Commons DSS Water Heater leak remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:16:22 AM
Creation date
3/27/2020 5:26:26 PM
Metadata
Fields
Template:
Contract
Date
2/28/2020
Contract Starting Date
2/28/2020
Contract Ending Date
6/30/2020
Contract Document Type
Agreement - Construction
Amount
$16,698.00
Document Relationships
R 2020-176 AMS - Sasser Hillsborough Commons DSS Water Heater leak remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: FB505150-8FFC-4352-9220-40CEECBDB354 <br /> .asset Sasser Companies <br /> CONTINUED-Conference Room <br /> DESCRIPTION QTY UNIT PRICE TAX O&P RCV DEPREC. ACV <br /> 20. Paint part of the walls-two coats 679.13 SF 0.82 9.17 113.22 679.28 (0.00) 679.28 <br /> 21. Mask and prep for paint-plastic, 95.54 LF 1.18 1.48 22.84 137.06 (0.00) 137.06 <br /> paper,tape(per LF) <br /> 22. Plumber-per hour 8.00 HR 95.03 0.00 152.04 912.28 (0.00) 912.28 <br /> 23. Electrical-Labor Minimum 1.00 EA 212.76 0.00 42.56 255.32 (0.00) 255.32 <br /> 24. Cleaning Technician-per hour 4.00 HR 32.46 0.00 25.96 155.80 (0.00) 155.80 <br /> Repairs Totals: 100.18 1221.10 7,326.55 7,326.55 <br /> Totals: Conference Room 100.18 1,221.10 7,326.55 0.00 7,326.55 <br /> Restroom Height: 8' <br /> 254.34 SF Walls 61.02 SF Ceiling <br /> 315.36 SF Walls&Ceiling 61.02 SF Floor <br /> x°sa°° 6.78 SY Flooring 31.79 LF Floor Perimeter <br /> v'5" 1 31.79 LF Ceil.Perimeter <br /> DESCRIPTION QTY UNIT PRICE TAX O&P RCV DEPREC. ACV <br /> REPAIRS <br /> No Work In This Area <br /> Totals: Restroom 0.00 0.00 0.00 0.00 0.00 <br /> Area Repairs Total: 206.23 2,015.48 12,092.69 12,092.69 <br /> Totals: Main Level 206.23 2,015.48 12,092.69 0.00 12,092.69 <br /> Labor Minimums Applied <br /> DESCRIPTION QTY UNIT PRICE TAX O&P RCV DEPREC. ACV <br /> REPAIRS <br /> 25. Vinyl floor covering labor 1.00 EA 45.66 0.00 9.14 54.80 (0.00) 54.80 <br /> minimum <br /> Repairs Totals: 0.00 9.14 54.80 54.80 <br /> Totals: Labor Minimums Applied 0.00 9.14 54.80 0.00 54.80 <br /> Area Repairs Total: 206.23 2,024.62 12,147.49 12,147.49 <br /> OC_SS REP 5/31/2019 Page: 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.