Orange County NC Website
DocuSign Envelope ID: FB505150-8FFC-4352-9220-40CEECBDB354 <br /> .asset Sasser Companies <br /> Hallway 2 Height: 8' <br /> 657.56 SF Walls 234.03 SF Ceiling <br /> 14������1��� � q�7�f 5'y <br /> ,,,,, , ,aauwayi 891.59 SF Walls&Ceiling 234.03 SF Floor <br /> 224'�3�i5'T'134 r„ <br /> 22'2" '5" 'Y 26.00 SY Flooring 80.75 LF Floor Perimeter <br /> estroo <br /> 89.42 LF Ceil.Perimeter <br /> Missing Wall-Goes to Floor 4' 1"X 6'8" Opens into Exterior <br /> Missing Wall-Goes to Floor 4'7"X 6' 8" Opens into Exterior <br /> Missing Wall 5'7"X 8' Opens into Exterior <br /> DESCRIPTION QTY UNIT PRICE TAX O&P RCV DEPREC. ACV <br /> REPAIRS <br /> 9. Cove base molding-rubber or vinyl, 10.00 LF 1.71 0.78 3.58 21.46 (0.00) 21.46 <br /> 4"high <br /> 10. Seal/prime then paint the surface 180.00 SF 0.81 1.94 29.54 177.28 (0.00) 177.28 <br /> area(2 coats) <br /> 11. Final cleaning-construction 234.03 SF 0.19 0.00 8.90 53.37 (0.00) 53.37 <br /> Repairs Totals: 2.72 42.02 252.11 252.11 <br /> Totals: Hallway 2 2.72 42.02 252.11 0.00 252.11 <br /> 11way <br /> Conference Room Height:8' <br /> N+ i 764.33 SF Walls 391.47 SF Ceiling <br /> N" I 1155.80 SF Walls&Ceiling 391.47 SF Floor <br /> ferenceR 43.50 SY Flooring 95.54 LF Floor Perimeter <br /> 95.54 LF Ceil.Perimeter <br /> �15'6"---1 <br /> DESCRIPTION QTY UNIT PRICE TAX O&P RCV DEPREC. ACV <br /> REPAIRS <br /> 12. Floor prep(scrape rubber back 391.47 SF 0.44 0.00 34.46 206.71 (0.00) 206.71 <br /> residue) <br /> 13. Carpet tile 391.47 SF 3.27 76.10 271.24 1,627.45 (0.00) 1,627.45 <br /> 14. Carpet-metal transition strip 4.50 LF 2.05 0.34 1.90 11.47 (0.00) 11.47 <br /> 15. Cove base molding-rubber or 95.54 LF 1.71 7.48 34.18 205.03 (0.00) 205.03 <br /> vinyl,4"high <br /> 16. 5/8"drywall-hung,taped,floated, 85.20 SF 1.94 3.28 33.72 202.29 (0.00) 202.29 <br /> ready for paint <br /> 17. Tape joint for new to existing 42.60 LF 6.76 0.89 57.78 346.65 (0.00) 346.65 <br /> drywall-per LF <br /> 18. Cabinetry(Bid Item) 1.00 EA 2,060.00 0.00 412.00 2,472.00 (0.00) 2,472.00 <br /> 19. Seal/prime then paint the surface 85.20 SF 1.11 1.44 19.20 115.21 (0.00) 115.21 <br /> area twice(3 coats) <br /> OC_SS REP 5/31/2019 Page:4 <br />