Browse
Search
2020-176-E AMS - Sasser Hillsborough Commons DSS Water Heater leak remediation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-176-E AMS - Sasser Hillsborough Commons DSS Water Heater leak remediation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:16:22 AM
Creation date
3/27/2020 5:26:26 PM
Metadata
Fields
Template:
Contract
Date
2/28/2020
Contract Starting Date
2/28/2020
Contract Ending Date
6/30/2020
Contract Document Type
Agreement - Construction
Amount
$16,698.00
Document Relationships
R 2020-176 AMS - Sasser Hillsborough Commons DSS Water Heater leak remediation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: FB505150-8FFC-4352-9220-40CEECBDB354 <br /> .asset Sasser Companies <br /> CONTINUED-Hallway 3 <br /> DESCRIPTION QTY UNIT PRICE TAX O&P RCV DEPREC. ACV <br /> Totals: Hallway 3 0.00 0.00 0.00 0.00 0.00 <br /> zzr 4^ <br /> T aar" Computer Lab Height: 8' <br /> 7F 704.00 SF Walls 483.97 SF Ceiling <br /> Computer Lab - 1187.97 SF Walls&Ceiling 483.97 SF Floor <br /> 11way <br /> 53.77 SY Flooring 88.00 LF Floor Perimeter <br /> c" <br /> 88.00 LF Ceil.Perimeter <br /> DESCRIPTION QTY UNIT PRICE TAX O&P RCV DEPREC. ACV <br /> REPAIRS <br /> 3. Floor prep(scrape rubber back 483.97 SF 0.44 0.00 42.60 255.55 (0.00) 255.55 <br /> residue) <br /> 4. Carpet tile 483.97 SF 3.27 94.08 335.34 2,012.00 (0.00) 2,012.00 <br /> 5. Cove base molding-rubber or vinyl, 88.00 LF 1.71 6.89 31.48 188.85 (0.00) 188.85 <br /> 4"high <br /> 6. Painting-Minimum Charge-Labor 1.00 EA 224.18 2.36 45.32 271.86 (0.00) 271.86 <br /> and Material <br /> Touch up walls. <br /> 7. Content Manipulation charge-per 20.00 HR 28.96 0.00 115.84 695.04 (0.00) 695.04 <br /> hour <br /> Labor to disconnect computer workstations to allow for carpet install. <br /> 8. Cleaning Technician-per hour 4.00 HR 32.46 0.00 25.96 155.80 (0.00) 155.80 <br /> Repairs Totals: 103.33 596.54 3,579.10 3,579.10 <br /> Totals: Computer Lab 103.33 596.54 3,579.10 0.00 3,579.10 <br /> OC_SS REP 5/31/2019 Page: 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.