Browse
Search
2020-148-E AMS - Riley Surveying BOE utility and topo
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-148-E AMS - Riley Surveying BOE utility and topo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 8:37:10 AM
Creation date
3/27/2020 5:22:08 PM
Metadata
Fields
Template:
Contract
Date
2/26/2020
Contract Starting Date
2/26/2020
Contract Document Type
Agreement - Services
Amount
$9,350.00
Document Relationships
R 2020-148 AMS - Riley Surveying BOE utility and topo
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8BEA9913-12A1-4A06-9E5D-4435F48FD2F5 <br /> Riley Surveying, P.A. <br /> 3326 Durham Chapel Hill Blvd., Ste. B-100 <br /> Durham, North Carolina 27707 <br /> AN AGREEMENT <br /> FOR THE PROVISION <br /> OF LIMITED <br /> PROFESSIONAL SERVICES <br /> DATE: February 18,2020 <br /> CLIENT: County of Orange <br /> 131 West Margaret Lane, Suite 300 <br /> Hillsborough, NC 27278 <br /> Attn: Sandra D'Arensbourg, Capital Projects Manager <br /> PROJECT NAME/LOCATION: Government Services Annex <br /> Partial Topographic Survey <br /> Hillsborough,NC <br /> SCOPE AND EXTENT OF SERVICES: Deed research, field measurements, computations, <br /> computer drafting necessary to perform a Partial Topographic Survey of 208 South Cameron Street <br /> (PIN 9874-15-3612) as shown on an attachment herein referenced in order to prepare mapping <br /> which accurately depicts: one foot contour intervals, building with finished floor elevations, <br /> driveways,parking areas, edge of pavement and curbs, sidewalks, easements as found in the public <br /> record, overhead utility wires/poles,marked underground utilities and storm/sewer structures w/ <br /> pipe data,treelines and other site improvements or features which may impact site design. <br /> Boundary information will be based on plats and deeds of record only. The survey shall comply <br /> with 21 NCAC 56 (NC Standards of Practice. The survey will be provided as a sealed hardcopy and <br /> digital files (unsealed .pdf& Awg). Survey to be based on NAVD '88. <br /> Fixed Fee- $9,350.00 (Including underground locator sub consultant fees) plus reimbursables <br /> SPECIAL CONDITIONS: 1)We are prepared to commence work within two weeks.Weather <br /> permitting,please allow approximately one week hence for survey <br /> completion and map delivery. <br /> 2) Underground utilities will be surveyed and mapped based on <br /> markings by a Private Contractor. <br /> The Terms and Conditions following this form are a part of this Agreement. <br /> This Agreement entered into as of the day and year first written above. <br /> CLIENT SURVEYOR <br /> Jos&Torres <br /> Authorized Signature Jose L. Torres, PLS <br /> Vice-President <br /> Phone—(919)667-0742 Email:jtorreskrileysurveyingpaxom <br /> NC Firm License C-1281 <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.