Browse
Search
2020-144-E AMS - Summit Engineering OPT Sewer tie in
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-144-E AMS - Summit Engineering OPT Sewer tie in
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 8:23:38 AM
Creation date
3/27/2020 5:19:29 PM
Metadata
Fields
Template:
Contract
Date
2/20/2020
Contract Starting Date
2/20/2020
Contract Ending Date
2/20/2020
Contract Document Type
Contract
Amount
$4,200.00
Document Relationships
R 2020-144 AMS - Summit Engineering OPT Sewer tie in
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:86AA2D69-2618-49CA-ABD9-3717E162CF6E <br /> Orange County Transit Site - No Borings <br /> Transportation Building Site <br /> Task 1 — Due Diligence / Schematic Design — Concept Report: <br /> None <br /> Task 2 — Detailed Design: <br /> SUMMIT will develop the most economical route to extend the sanitary sewer <br /> lateral to the Transportation Building. We will prepare a plan to abandon the <br /> septic tank and a sanitary sewer lateral drawing to submit to the Town of <br /> Hillsborough for approval with the Sanitary Sewer Extension Permit. <br /> We anticipate that the following permits will be required for the project and SUMMIT <br /> will prepare and submit the applications to be reviewed by each authority. <br /> a) Town of Hillsborough Sanitary Sewer Extension Permit <br /> o A sanitary sewer extension permit will be required for providing sanitary <br /> sewer to the administration building. <br /> This is the only permit anticipated at this time. If during the review process it is <br /> determined that other permits will be required, SUMMIT will assist as needed with <br /> those permits on a time-and-material basis or per an approved Change Order. <br /> Task 3 — Contract Documents and Bid Assistance: <br /> Bid Administration — <br /> SUMMIT will prepare project specifications and bid documents. We will also <br /> assist in advertising the project, public bid opening, perform a bid review, <br /> prepare bid tabulations of the bids received, and submit a formal bid award <br /> recommendation to the County. Attend preliminary and other meetings <br /> throughout the Design and Bid process. <br /> Construction Administration — <br /> SUMMIT will provide onsite inspection personnel that will periodically monitor <br /> the contractor's adherence to the project plans and specifications. SUMMIT <br /> will review and approve all Pay Application and facilitate the processing of <br /> any necessary Change Orders. The project team will perform a final <br /> inspection of all locations and develop a punch list. We will monitor the <br /> completion of the final punch list and review the final pay application. <br /> Design Surveying Services: <br /> Topographic Survey <br />
The URL can be used to link to this page
Your browser does not support the video tag.