Browse
Search
2020-144-E AMS - Summit Engineering OPT Sewer tie in
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-144-E AMS - Summit Engineering OPT Sewer tie in
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 8:23:38 AM
Creation date
3/27/2020 5:19:29 PM
Metadata
Fields
Template:
Contract
Date
2/20/2020
Contract Starting Date
2/20/2020
Contract Ending Date
2/20/2020
Contract Document Type
Contract
Amount
$4,200.00
Document Relationships
R 2020-144 AMS - Summit Engineering OPT Sewer tie in
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:86AA2D69-2618-49CA-ABD9-3717E162CF6E <br /> Task 2 - Detailed Design: <br /> SUMMIT will develop construction drawings for each facility. The construction <br /> drawings will be reviewed by the County prior to us developing bid documents. Our <br /> subconsultant Cumming will provide 3rd party cost estimating services for the <br /> proposed improvements. If costs exceed project funds, the contract documents will <br /> include alternatives for projects over the estimated amount to allow the County to <br /> get bids and determine what improvements can be built at this time. <br /> Task 3 - Contract Documents and Bid Assistance: <br /> Bid Administration - <br /> SUMMIT will prepare project specifications and bid documents. We will also <br /> assist in advertising the project, public bid opening, perform a bid review, <br /> prepare bid tabulations of the bids received, and submit a formal bid award <br /> recommendation to the County. Attend preliminary and other meetings <br /> throughout the Design and Bid process. <br /> Construction Administration - <br /> SUMMIT will provide onsite inspection personnel that will periodically monitor <br /> the contractor's adherence to the project plans and specifications. SUMMIT <br /> will review and approve all Pay Application and facilitate the processing of <br /> any necessary Change Orders. The project team will perform a final <br /> inspection of all locations and develop a punch list. We will monitor the <br /> completion of the final punch list and review the final pay application. <br /> Task - Geotechnical services have been identified for each building as follows. <br /> Board of Elections - Six hand auger borings will be performed at the Board of <br /> Elections building and advanced to 6 feet or hand auger refusal, whichever comes <br /> first. Piezometers will be installed at two of the hand auger boring locations. <br /> Sheriff's Office - Three hand auger borings will be performed at the Sheriff's Office <br /> and advanced to 6 feet or hand auger refusal, whichever comes first. No piezometers <br /> will be installed at this location. <br /> Whitted Facility - Six borings will be advanced to 10 feet around the Recreation <br /> building with two piezometers installed in those borings. Four borings will be <br /> advanced to 10 feet around the Health building with temporary piezometers installed <br /> in two of those borings. One boring will be advanced to 10 feet at the dumpster area, <br /> and three borings will be advanced to 5 feet in the gravel parking lot leading to the <br /> dumpster to determine if more gravel will be required. Borings will be terminated if <br /> auger refusal occurs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.