Browse
Search
2020-144-E AMS - Summit Engineering OPT Sewer tie in
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-144-E AMS - Summit Engineering OPT Sewer tie in
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 8:23:38 AM
Creation date
3/27/2020 5:19:29 PM
Metadata
Fields
Template:
Contract
Date
2/20/2020
Contract Starting Date
2/20/2020
Contract Ending Date
2/20/2020
Contract Document Type
Contract
Amount
$4,200.00
Document Relationships
R 2020-144 AMS - Summit Engineering OPT Sewer tie in
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:86AA2D69-2618-49CA-ABD9 3717E162CF6E <br /> USUMMIT 320 Executive Court, Hillsborough, NC 27278 <br /> DESIGN AND ENGINEERING SERVICES Phone // 919.732.3883 Web // www.summitde.net <br /> January 8, 2020 Revised January 14, 2020 <br /> Revised January 21, 2020 Revised January 29, 2020 Revised February 12, 2020 <br /> Sandra D'Arensbourg <br /> Orange County Asset Management Services <br /> sdarensbourg@orangecountync.gov <br /> Re: Orange County Stormwater Services Fee Proposal <br /> RFQ#5267 — Qualification Proposal Sent 8/22/19 <br /> Dear Ms. D'Arensbourg: <br /> SUMMIT is pleased with the opportunity to provide this scope and fee proposal for <br /> consulting services for the development of the above referenced properties. The <br /> following scope and fees are based on our January 2, 2020 meeting where all of the <br /> projects were discussed in great detail. We look forward to working with you to meet <br /> the needs and goals for these projects. <br /> A more detailed description of each project along with a sketch highlighting scope <br /> of work for each project is in Appendix A. <br /> SCOPE OF WORK <br /> The following Tasks would be similar for all buildings except the Motor Pool / <br /> Transportation Administration building which has more detail for plan preparation. <br /> The Motor Pool design is to include permitting drawings but not being bid at this <br /> time. The Transportation Administration Building is to include a sanitary sewer <br /> extension which will require a separate NCDENR sewer line extension permit and <br /> certification. Zoning permit (ZCP), COA and minor works applications will be <br /> included where needed within the Historic District (all but the Motor Pool facility). <br /> Task 1 — Due Diligence / Schematic Design — Concept Report; <br /> SUMMIT will perform due diligence on each site including a field walk identifying <br /> problem areas. The information gathered at these field walks will be used to <br /> develop conceptual solutions. These solutions along with Atlas Engineering's review <br /> will be put together to generate a Concept Report. This Report will identify problem <br /> areas and recommended solutions for the problems. If proposed improvements <br /> exceed project funds, we will prioritize the list to allow the County to select what <br /> improvements should be made at this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.