Browse
Search
Agenda - 06-05-2001-9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 06-05-2001
>
Agenda - 06-05-2001-9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 7:16:28 PM
Creation date
8/29/2008 10:32:47 AM
Metadata
Fields
Template:
BOCC
Date
6/5/2001
Document Type
Agenda
Agenda Item
9e
Document Relationships
Minutes - 06-05-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Staff Summary of Robson and Woese HVAC System Life Cycle Analysis a <br />Richard E. Whiffed and Northern Human Services Center <br />Richard E. Whiffed Human Services Center <br />System.. Probable Energy' Simple Uniform <br />" Median <br />Description Construction Costs Payback, Annual <br />Cost Useful <br /> <br /> <br />Cost. ($) r; , <br /> <br />a <br />~$)~Ye y <br /> <br />ears <br />~$) <br />System Life <br /> ears <br />Multi-zone, Air- <br />cooled chiller <br />and natural gas $1,204,900 $60,900 N/A $105,800 20 <br />bolter <br />VAV, Air-cooled <br />~ _ ~ ". <br />"c <br />liiller arld . ;r <br />~ ` ~ . ~ ~ .; ~ ~~ <br />~ ~ ~ ~~ <br />natural .gas <br />: <br />~ <br />~ <br />~ ~~ ,~~$1 X3(19,2©0- <br />a»~' ,$49,500 <br />~~~~ ,~8 0 <br />~_ ~~~ , ...$98,200 ;. <br />,~6. ~ 20 <br />p~ler : -, <br />b <br />._ <br />We recommend the insfallation of a variable air volume system with terminal reheat for the <br />Whiffed Building based on uniform annual cost. Cooling source will be an air cooled wafer <br />chiller to replace the existing water-cooled unit. <br />Northern Human Services Center <br />~~y~stem Descriih!tian Prnb"able , ":'" fi ' rgy tltiifbrm Median. <br /> Constructuon Costs. ($) Annual Cast Useful . <br /> Cost ($) y., . ($) SYstem'l_ife <br />f ~ ~~ cars <br />Multi-zone, Air- <br />cooled "Chiller and <br />Fuel Oil Boiler $621,700 $37 100 $60,200 20 <br />Multi-zone, Air- <br />cooled Chiller and <br />Pro ane Boiler $613,200 $58,500 $81 300 20 <br />VA ~ ir-coaled ::f <br />~.~ <br />~ r"" i ~~~~ ,~ ~ <br />~ ~ I , <br />y : ~ . ,' ',4 ~ , <br />Chiller°and Fuel Dil - ~: w ~..., <br /> <br />VAV, Air-cooled <br />Chiller and Propane <br />Boiler $595,400 $34,800 $57,000 20 <br />PRTU--Multi-zone $521,300 $57,200 $85,300 15 <br />PRTU-VAV $506,200 $33 200 $60,400 15 <br />PTAC $328,140 $26,800 $69,200 ~ 6 <br />Window AC & 6 (window AC) <br />Steam Boiler $464,660 $24 200 $57,700 20 boiler <br />We recommend the installation of a new HVAC system genera!!y consisting "'of a variable air <br />volume HVAC system with terminal reheat, utilising an air cooled chiller and oil fired boiler based <br />on uniform annua! cost. <br />
The URL can be used to link to this page
Your browser does not support the video tag.