Orange County NC Website
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: June 5, 2001 <br />Action Agenda <br />Item No. ~ " ~ <br />.SUBJECT: Whiffed and Northem Center HVAC Options Report and Authorization to Solicit <br />RFP for Desi n Services <br />DEPARTMENT: Public Works PUBLIC HEARING: (Y/N) No <br />ATTACHMENT(S): <br />^ Staff Summary of Robson &Woese <br />HVAC System Life Cycle Analysis - <br />R,E. Whiffed ~ Northem Centers <br />^ Introduction to HVAC systems and <br />life cycle analysis and appendices <br />^ HVAC System Life Cycle Analysis <br />Report: R. E. Whiffed and Northem <br />Centers -Executive Summary <br />INFORMATION CONTACT: <br />Wilbert McAdoo, ext 2625 <br />TELEPHONE NUMBERS: <br />Hillsborough 732-8181 <br />Chapel Hill 9684501 <br />Durham 688-7331 <br />Mebane 33fi-227-2031 <br />PURPOSE: <br />1) To provide background information regarding heating/ventilation and air conditioning (HVAC) <br />system design considerations and life cycle analysis; and <br />2) To present Robson 8~ Woese, Inc. life cycle analysis report for Richard E. Whiffed Human <br />Services Center (REWHS) and Northem Human Services Center (NHSC); and <br />3) To request BOCC approval to issue Request for Proposal documents for HVAC system <br />design work for replacement systems for REWHS and NHSC. <br />BACKGROUND: On June 29, 2000, the BOCC awarded the proposal and approved <br />contracting with Robson and Woese, Inc., Consulting Engineers to prepare a feasibility study <br />that would identify the most economically efficient options for HVAC systems at both the <br />Whiffed Human Services Center and the Northem Human Services Center. <br />Since that time, the Public Works staff has worked with Robson and Woese on completion of <br />the feasibility study. The feasibility study was originally to be completed by Fall 2000, however, <br />one of the principal engineers involved in the project left during this period and the work was <br />delayed significantly. The feasibility study has now been completed and has been attached to <br />this abstract. Also attached to this abstract is a staff summary of the Robson and Woese <br />report, including recommendations. <br />No contract has been executed with Robson and Woese to complete the design of the systems <br />at the Whiffed and Northem Human Services Centers. Based upon the staffing changes and <br />time delays in producing the work, the staff recommends that a new RFP be issued for HVAC <br />system design work for these two facilities. <br />