Browse
Search
2020-220-E AMS - Racanelli PFAP sprinkler heads and lights repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-220-E AMS - Racanelli PFAP sprinkler heads and lights repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 3:37:56 PM
Creation date
3/27/2020 9:38:52 AM
Metadata
Fields
Template:
Contract
Date
3/19/2020
Contract Starting Date
5/1/2020
Contract Document Type
Agreement - Interlocal
Amount
$9,414.00
Document Relationships
R 2020-220 AMS - Racanelli PFAP sprinkler heads and lights repair
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: DB5FD682-9018-443A-B967-D3449D69B2DF <br /> Crawford Sprinkler Company of Raleigh,Inc. <br /> Piedmont Food and AG—New Freezers—Hillsborough NC <br /> March 4,2020 <br /> Page 2 of 3 <br /> • Cutting, drilling or any penetrations in structural steel. <br /> All work shall be done during a normal (40) hour per week work schedule. <br /> Sprinkler system drawings per NFPA codes must be coordinated with architectural, structural, mechanical <br /> and electrical plans; therefore, the sprinkler drawings cannot commence until we receive these plans. <br /> No purchasing of materials, fabrication of piping, or installation shall commence until all necessary <br /> approvals on plans and submittals are received. Slowness or delays in the approval process may cause <br /> delays in the project. <br /> Sprinkler piping location is restricted and governed by National Fire Protection Codes. Crawford Sprinkler <br /> Co. of Raleigh, Inc., prepares shop drawings showing the location of all piping. These drawings will be <br /> furnished to Buyer or Owner and other trades for coordination upon request. Any changes to these <br /> drawings are to be made prior to fabrication of piping systems. <br /> This proposal is based upon the installation being made from a finished, unobstructed, concrete, wooden, <br /> or other type smooth floor using rolling scaffolding, fork lifts, man lifts, or other similar equipment. We will <br /> not work off earth or other unfinished surfaces. <br /> This proposal is based upon work being performed within a "Dried-In" building. <br /> Buyer is to provide sufficient heat throughout all portions of the building to be equipped with a wet pipe <br /> system in order to prevent any freezing of water in the sprinkler pipes. <br /> This proposal is based on NFPA codes and nationally accepted fire protection practices. It does not <br /> include any provision for local authorities' requirements or inspection items that may exceed National Fire <br /> Protection Association requirements and/or the North Carolina Building Code. <br /> Crawford Sprinkler Co. of Raleigh, Inc. is not responsible for the design of the structural system and <br /> therefore does not accept any responsibility/ liability for its adequacy. Our price includes hangers to <br /> support the sprinkler system from the structure, it does not include any additional re-enforcing of the <br /> structural system to meet any load requirements of the authority having jurisdiction. <br /> No back charges shall be accepted by Crawford Sprinkler Co. of Raleigh, Inc. unless forty-eight (48) <br /> hours written notice is given to correct any alleged work deficiencies, damages or clean up necessitating <br /> such back charges and unless said work, damages or clean up is the fault of Crawford Sprinkler Co. of <br /> Raleigh, Inc. <br /> No work shall commence until a written contract is agreed to. Working drawings may start only upon <br /> receipt of a letter of intent. However, plans will not be submitted until the official contract is agreed to. <br /> Due to unstable conditions from our vendors, we are unable to hold prices firm beyond (30) days from the <br /> date on this proposal. If order is not received within (30)days, we reserve the right to review and adjust <br /> our quotation accordingly. <br /> Payments on material and labor, furnished under this proposal, shall be made in monthly installments, <br /> each installment equaling 90% of all work completed and materials stored on job site, due and payable to <br /> Crawford Sprinkler Co. of Raleigh, Inc., by the 10th day of the following month. If payments are not <br /> received when due--work may stop and will not re-start until all monies owed are paid in full. Final <br /> payment shall become due and payable upon completion, test, and placing in service of the system. <br /> Crawford Sprinkler Co. of Raleigh, Inc., shall remain the Owner of the sprinkler system and related <br /> equipment installed without record to where attached, until it is paid in full. <br /> All terms and conditions outlined herein shall become a part of any contract entered into. <br /> Y:\JEFF\PROPOSALS\Piedmont Food and AG-New Freezers-500 Valley forge Road-Hillsborough NC 27278.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.