Browse
Search
2020-220-E AMS - Racanelli PFAP sprinkler heads and lights repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-220-E AMS - Racanelli PFAP sprinkler heads and lights repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 3:37:56 PM
Creation date
3/27/2020 9:38:52 AM
Metadata
Fields
Template:
Contract
Date
3/19/2020
Contract Starting Date
5/1/2020
Contract Document Type
Agreement - Interlocal
Amount
$9,414.00
Document Relationships
R 2020-220 AMS - Racanelli PFAP sprinkler heads and lights repair
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: DB5FD682-9018-443A-B967-D3449D69B2DF <br /> r <br /> Cris wf and <br /> r SPRINKLER CO. <br /> OF RALEIGH, INC. <br /> 2725 S.SAUNDERS STREET-RALEIGH, NC 27603•PO 80X 26207-RALEIGH, NC 27611 <br /> PHONE 919-828-9346•FAX 919-839-8164 <br /> N.C.STATE LICENSE#09881, FS-I•FEB.TAX I.U. 56-M2716 <br /> March 4, 2020 <br /> Scott Drebitko <br /> Racanelli Construction South This proposal included <br /> 1091 Pemberton Hill Road for cost reference back <br /> Suite 102 up only: this is a 2nd <br /> Apex NC 27502 quote obtained for the <br /> 919-363-3600 ph <br /> 919-812-5261 cell addition of sprinklers. <br /> sdrebitko@racanelliconstruction.com <br /> RE: Piedmont Food &AG — New Freezers <br /> Hillsborough NC <br /> Scott <br /> We are pleased to offer you our quotation for providing fire protection sprinkler system additions and <br /> alterations for the above referenced project. <br /> Our price includes the following: <br /> • All material, equipment, taxes, and labor needed to install sprinklers in the 2 new freezers. <br /> • Freezers will be protected by dry sidewall sprinklers if possible, or a new anti -freeze type system with <br /> sprinklers and piping exposed inside the new freezers. <br /> • This proposal is based on the assumption that the city water supply will sustain any additions/ <br /> alterations utilizing the existing sprinkler piping nearest the new freezer locations. <br /> • Shop drawings by a NICET level III designer. <br /> • City permit fee. <br /> • One year limited warranty. <br /> Our price for this work is .........................................................................................................$7,950.00 <br /> SEVEN THOUSAND, NINE HUNDRED FIFTY DOLLARS <br /> We have not included: <br /> • Shut down fees if any. <br /> • Raising and/or modifying existing branch lines and main piping. <br /> • Alarm panels, systems, control wiring, etc. <br /> • Additional work not listed in scope above. <br /> • Cleaning, painting or protection of sprinklers, piping and /or equipment. <br /> • Electric power wiring. <br /> • Bond. <br /> • P.E. sealed drawings. <br /> • Overtime labor. <br /> • Seismic bracing. <br /> • Fire extinguishers. <br /> • Reinforcing angles at steel joists. <br /> • Fire Caulking. <br /> SALES , DESIGN - INSTALLATION - INSPECTIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.