Orange County NC Website
DocuSign Envelope ID: DB5FD682-9018-443A-B967-D3449D69B2DF <br /> r <br /> Cris wf and <br /> r SPRINKLER CO. <br /> OF RALEIGH, INC. <br /> 2725 S.SAUNDERS STREET-RALEIGH, NC 27603•PO 80X 26207-RALEIGH, NC 27611 <br /> PHONE 919-828-9346•FAX 919-839-8164 <br /> N.C.STATE LICENSE#09881, FS-I•FEB.TAX I.U. 56-M2716 <br /> March 4, 2020 <br /> Scott Drebitko <br /> Racanelli Construction South This proposal included <br /> 1091 Pemberton Hill Road for cost reference back <br /> Suite 102 up only: this is a 2nd <br /> Apex NC 27502 quote obtained for the <br /> 919-363-3600 ph <br /> 919-812-5261 cell addition of sprinklers. <br /> sdrebitko@racanelliconstruction.com <br /> RE: Piedmont Food &AG — New Freezers <br /> Hillsborough NC <br /> Scott <br /> We are pleased to offer you our quotation for providing fire protection sprinkler system additions and <br /> alterations for the above referenced project. <br /> Our price includes the following: <br /> • All material, equipment, taxes, and labor needed to install sprinklers in the 2 new freezers. <br /> • Freezers will be protected by dry sidewall sprinklers if possible, or a new anti -freeze type system with <br /> sprinklers and piping exposed inside the new freezers. <br /> • This proposal is based on the assumption that the city water supply will sustain any additions/ <br /> alterations utilizing the existing sprinkler piping nearest the new freezer locations. <br /> • Shop drawings by a NICET level III designer. <br /> • City permit fee. <br /> • One year limited warranty. <br /> Our price for this work is .........................................................................................................$7,950.00 <br /> SEVEN THOUSAND, NINE HUNDRED FIFTY DOLLARS <br /> We have not included: <br /> • Shut down fees if any. <br /> • Raising and/or modifying existing branch lines and main piping. <br /> • Alarm panels, systems, control wiring, etc. <br /> • Additional work not listed in scope above. <br /> • Cleaning, painting or protection of sprinklers, piping and /or equipment. <br /> • Electric power wiring. <br /> • Bond. <br /> • P.E. sealed drawings. <br /> • Overtime labor. <br /> • Seismic bracing. <br /> • Fire extinguishers. <br /> • Reinforcing angles at steel joists. <br /> • Fire Caulking. <br /> SALES , DESIGN - INSTALLATION - INSPECTIONS <br />