Orange County NC Website
DocuSign Envelope ID: DB5FD682-9018-443A-B967-D3449D69B2DF <br /> V IVU111VIR wood and Ag Freezer <br /> Racanelli Change Order Request <br /> Racanelli Construction South, Inc. Proposal and Pricing Summary <br /> 1001 Pemberton Hill Road,Suite 202 RCS Project#19-008 <br /> Apex,NC 27502 Date: 3/10/2020 <br /> Submitted To: <br /> Orange County <br /> 131 West Margeret Lane COR#5 <br /> Hillsborough,NC 27278 <br /> Attention : Angel Barnes via email <br /> Per RCS PCO#5 dated 2/24/20, we are pleased to provide the following proposal to provide Fire Sprinkler Protection in <br /> the two new freezers per Jerry Wagner/Town of Hillsborough Fire Marshal on 2/24/20. <br /> Labor Material <br /> Unit Unit Sub Unit Labor Material Subcontractor <br /> Item Qty Unit Price Price Price Total Total Total Total <br /> Strategic Connections Fire Protection <br /> 1 Division(see attached proposal) 1 LS $ 3,350.00 $ 3,350.00 $ 3,350.00 <br /> 2 Sprinkler Permit Fee 1 LS $ 70.00 $70 $ 70.00 <br /> Subtotals $0.00 $70 $ 3,350.00 $ 3,420.00 <br /> Small Tools&Consumables @ 5% on <br /> General Conditions see attached $ 3,522.00 <br /> Labor Burden 38% on $ - <br /> Sales Tax on Materials 7.50% on $ - <br /> Racanelli Construction South Overhead @ 10% on $ 6,942.00 $ 694.20 <br /> Racanelli Construction South Profit @ 5% on $ 7,636.20 $ 381.81 <br /> Insurance Premium @ 1.35% on $ 8,018.01 $ 108.24 <br /> TOTAL AMOUNT OF CHANGE ORDER REQUEST <br /> TOTAL TIME(CALENDAR DAYS) REQUESTED FOR THIS CHANGE 45 <br /> Change Order Request accepted and authorized for contract Change Order <br /> Authorized By Architect: Date: <br /> Authorized By Owner: Date: <br /> cc: SD/file <br /> Notes: 1.)We reserve the right to claim additional cost and time extensions associated with this COR at a later time.2.)Racanelli's <br /> Change Order Request is qualified per the proposal attached by Strategic Connections dated 3/9/20.3.)We do include the Sprinkler <br /> Permit Fee.4.)We exclude any fire alarm work should it be required.5.)We include fire sprinkler design,calculations and submittal <br /> package to the Fire MArshal for approval.6.)We exclude a water flow test on the existing supply line.Our proposal is based on utilizing the <br /> Town's water flow test information.7.)The extended coverage sprinkler heads proposed have a 2-3 week lead time from release. <br /> We Have Not been authorized to proceed with this work. By: soott w.Drebtleo <br /> This Proposal may be withdrawn from us if not accepted within 15 Days. Vice President <br />