Browse
Search
2020-220-E AMS - Racanelli PFAP sprinkler heads and lights repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-220-E AMS - Racanelli PFAP sprinkler heads and lights repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2020 3:37:56 PM
Creation date
3/27/2020 9:38:52 AM
Metadata
Fields
Template:
Contract
Date
3/19/2020
Contract Starting Date
5/1/2020
Contract Document Type
Agreement - Interlocal
Amount
$9,414.00
Document Relationships
R 2020-220 AMS - Racanelli PFAP sprinkler heads and lights repair
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: DB5FD682-9018-443A-B967-D3449D69B2DF <br /> [Departmental Use Only] <br /> TITLE Sprinkler Light <br /> FY 2019-2020 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 19th <br /> day of March, 2020, by and between Racanelli Construction South, Inc., (hereinafter called the <br /> "Contractor"), and Orange County, a political subdivision of the State of North Carolina, (hereinafter <br /> called the "County," "Orange County," and/or"Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br /> event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br /> interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by N/A (Sheet dated ) <br /> b. Written specifications prepared by the project engineer. <br /> c. Racanelli Construction South, Inc. proposal dated March 10 & 13, 2020 which fully <br /> describes the work to be performed. Such work will hereafter be called the "Work". <br /> d. Related documents listed under Section 1 above. <br /> 3. TERM AND SCHEDULING <br /> Revised 11/19 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.