Orange County NC Website
DocuSign Envelope ID: FAA1 FA78-7DF4-4BEA-9C1 F-157525F063B9 <br /> Walnut Grove Wastewater Disposal Evaluation <br /> March 19, 2020 Page 2 of 4 <br /> technologies identified during research may be ruled out as viable options and not <br /> included in task 3 below. <br /> Task 3 - Evaluation Study and Report <br /> Draper Aden Associates will prepare an opinion of probable construction costs for the <br /> viable options identified in task 2 above. The construction cost opinions will also include <br /> the necessary permitting and design costs. <br /> The capital cost of each system will then be utilized in a study to evaluate the life cycle <br /> costs of each option. The life cycle cost analysis will capture long term operational costs <br /> such as operator labor, energy, system supplies, and maintenance. A selection matrix will <br /> be generated to evaluate the above and other non-tangible criteria. <br /> Based on the results of the above activities, a report or technical memorandum will be <br /> generated summarizing the options reviewed, the results of this study, and the <br /> recommended system to be installed. <br /> ADDITIONAL SERVICES <br /> All other services not expressly defined above in this task proposal will be considered additional <br /> services and could be subject to additional task order proposal(s) and costs. Once a wastewater <br /> disposal system has been selected by the Owner, DAA will present a task order for the design, <br /> permitting and construction administration for the chosen system. <br /> SCHEDULE <br /> DAA proposes to complete Task 1 through Task 3 within 45 days of notice to proceed. <br /> COMPENSATION <br /> Compensation for engineering services and reimbursable expenses shall be based on a lump <br /> sum fees presented below. This fee will be invoiced monthly based on our estimation of the <br /> percentage complete on each task. <br /> Task Estimated Fee <br /> Task 1 — Soils Evaluation $1,200 <br /> Task 2 —Option Identification $5,250 <br /> Task 3 —Analysis and Report $6,500 <br /> Total $12,950 <br /> This proposal is valid for 30 days from the date of the proposal. If the proposal is not accepted <br /> within 30 days, we reserve the right to revise or withdraw the proposal entirely at our discretion. <br /> Please confirm your acceptance of this proposal by signing one copy and returning it to our <br />