Browse
Search
2020-199-E AMS - HH Architecture Churton Grove upfit
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-199-E AMS - HH Architecture Churton Grove upfit
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 11:01:40 AM
Creation date
3/27/2020 9:30:16 AM
Metadata
Fields
Template:
Contract
Date
2/14/2020
Contract Starting Date
2/14/2020
Contract Ending Date
6/30/2020
Contract Document Type
Contract
Amount
$4,900.00
Document Relationships
R 2020-199 AMS - HH Architecture Churton Grove upfit
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:B4E2BBD3-F2DA-436D-AB94-747C600058E2 <br /> In order to meet the accelerated schedule for an early March permit drawing submittal,we will <br /> need to replace our current fire protection, plumbing, mechanical, and electrical engineering <br /> consultant with a new consultant for both the 405 Meadowlands and 149 N 5cottswood Blvd <br /> Properties. <br /> Consultants <br /> For Mechanical, Plumbing, Electrical,and Fire Protection Engineering,we propose: <br /> EnTech Engineering, P.A. <br /> Contact: Rod Brown, PE <br /> 1071 N Berkley Blvd <br /> Goldsboro, NC 27534 <br /> (919)778-9064 <br /> Additional Fee <br /> For the scope detailed above,we propose the following lump sum fees: <br /> Additional Test-Fit $1,900 <br /> Increased HVAC Scope $1,200 <br /> MEP Field Verification(if needed) $1,800 <br /> Total $4,900 <br /> Schedule <br /> The following schedule will provide permit drawings for the 149 N Scottswood Blvd property in <br /> the first week of March: <br /> 75%C❑ Review Drawings 2 weeks from Notice to Proceed <br /> Final Permit Drawings 1 week <br /> Please let me know if you need additional information.We are excited to continue working with <br /> the County. <br /> Kristen M. Hess,AIA, LEED AP <br /> Principal <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.