Browse
Search
2020-146-E Solid Waste - American Industrial HVAC repair
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-146-E Solid Waste - American Industrial HVAC repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 8:32:35 AM
Creation date
3/27/2020 9:16:12 AM
Metadata
Fields
Template:
Contract
Date
2/20/2020
Contract Starting Date
2/20/2020
Contract Ending Date
3/20/2020
Contract Document Type
Agreement - Services
Amount
$12,796.00
Document Relationships
R 2020-146 Solid Waste - American Industrial HVAC repair
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:7EF04F9E-81 E3-46C4-l358E-2A08DD460FC4 <br /> Exhibit 1 <br /> ,�A <br /> MERICAN <br /> INDUSTRIAL <br /> PO Box 16224 • Greensboro,NC • (336)855-3301 <br /> NC License 15437•NC Firm License D-0387 <br /> February 17,2020 <br /> Wanda McCain <br /> Orange County Solid Waste <br /> 1207 Eubanks Road <br /> Chapel Hill NC 27516-7177 <br /> Re: Split System Unit Replacement <br /> Hello Wanda, <br /> We are pleased to offer our quote to replace the faulty 7-ton Split System heat pump that serves the right <br /> side of the facility. This system has a faulty evaporator coil causing the refrigerant to leak from the <br /> system causing cooling and heating issues. The original system is the Trane brand and is dual circuit. The <br /> new system we are proposing is the Trane Brand as well and will match the capacity/tonnage of the <br /> original system.We will also include new 15kw electrical auxiliary heaters to replace the auxiliary <br /> heaters that are on the original system to give you all a brand-new system throughout. The existing line <br /> sets will be reused because they are in very good condition. This work will take approximately one to two <br /> days to complete. <br /> Scope of work: <br /> • Labor and material to demo the existing 7-ton Trane Heat Pump <br /> • Labor and material to install New Trane 7-ton Heat Pump <br /> • Labor and material to make all duct modifications to connect to the new system <br /> • Labor and material to connect all refrigerant lines <br /> • Labor and material to reconnect all low and high voltage wiring <br /> • Labor and material to reconnect all drain lines <br /> • Labor and material to evacuate all non-condensable from the system <br /> • Labor and material to install 15kw electric heaters <br /> • Labor and material to reinsulate the new portion of the line set <br /> • Test and start-up <br /> • Rigging <br /> • Permits <br /> Price for the scope of work listed above $12,796.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.