Browse
Search
2020-174-E AMS - Smith Sinnett CJRD improvements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-174-E AMS - Smith Sinnett CJRD improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 10:05:57 AM
Creation date
3/20/2020 2:16:52 PM
Metadata
Fields
Template:
Contract
Date
2/27/2020
Contract Starting Date
2/27/2020
Contract Document Type
Agreement - Consulting
Amount
$21,630.00
Document Relationships
R 2020-174 AMS - Smith Sinnett CJRD improvements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: E507D34E-B770-494F-BD49-226635914144 <br /> smithsinnett <br /> ARCHITECTURE <br /> February 20, 2020 <br /> Orange County <br /> 200 South Cameron Street <br /> Hillsborough, North Carolina 27278 <br /> Attn.: Ms.Angel Barnes <br /> Assistant Director,Asset Management Services <br /> Dear Ms. Barnes: <br /> FEE PROPOSAL: Criminal Justice Resources Department Renovations <br /> Smith Sinnett Architecture greatly appreciates the opportunity to provide Orange County with a proposal <br /> for Architectural Design & Engineering Services for the Criminal Justice Resources Department <br /> renovation project, located at 104 East Margaret Lane, Hillsborough, North Carolina. <br /> SCOPE OF WORK: <br /> The Criminal Justice Resources Department is currently housed in the lower level of the Justice Center <br /> amongst two adjoining office suites. The suites are densely arranged into small offices and narrow <br /> corridors. A new, more efficient plan layout will be designed and existing architectural detailing will be <br /> maintained, where possible. Existing doors are difficult to replace and are to be repurposed where <br /> possible. A new Conference room is needed to support the Department. The conference room should <br /> be located across the hall by reconfiguring two existing conference rooms. The Sheriff and the District <br /> Attorney's conference rooms will be retained. It is especially important that the DA's conference room <br /> have a separate access and not be disrupted by access to adjoining offices. <br /> Given the accelerated timeframe, we will want to meet with stakeholders as quickly as possible. <br /> Additionally, we will meet with you, the end users and the county commissioners and whoever you <br /> designate to be a necessary part of this process. <br /> We will provide per square foot cost estimating at the conclusion of the design development phase in <br /> order to endeavor to stay within your budget. Please understand, pricing the work is extremely <br /> challenging of late, and the fact that this project has a need for speed will likely increase costs. We will <br /> use recent experience to provide you with a ballpark cost range with which you can move forward. This <br /> cost,along with all architectural and engineering fees, are included within our overall fee. <br /> PROGRAMMING/SCHEMATIC DESIGN/DESIGN DEVELOPMENT: <br /> Smith Sinnett Architecture will work with and coordinate all members of the design team to evaluate the <br /> owner's requests and begin developing an approach to design and construction of the proposed <br /> improvements. During the programming phase, Smith Sinnett will meet with the owner's designated <br /> stakeholders to fine tune our understanding of space needs and the eventual build out of the up fit. After <br /> these conversations, we will develop a program and a preliminary budget. Initially, we expect to meet <br /> with Orange County's Planning Department to assess and meet all requirements for approvals. During <br /> the schematic design/design development phase we would anticipate attending meetings with the <br /> owner to present design progress and collect owner feedback. We will meet with your reviewing <br /> 4600 Lake Boone Trail, Suite 205 1 Raleigh, NC 27607 1919.781.8582 1 HUB Certified I www.smithsinnett.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.