Orange County NC Website
DocuSign Envelope ID:8880C4F3-E132-469D-9F1A-0516B69BADB7 <br /> • Vault toilets. <br /> ■ Traffic control plan. <br /> • Site telecommunications design. <br /> • Additional plan sets. <br /> • Additional reviews. <br /> • Express review meetings with local code officials <br /> • Commissioning <br /> • Design of unconventional systems such as solar, photovoltaic, mass notification or rainwater <br /> catchment. <br /> • Disc Golf Course design, course layout or administration of designer's contract <br /> • Major redesigns of the project from value engineering or cost reconciliation processes that create <br /> a significant divergence from the park approach previously agreed upon at 60% design submittal. <br /> • Redesign or value engineering of the building or systems after bidding. <br /> ■ SUE investigations of existing water line depth at tie in. Assumed all other utilities in the area are <br /> on the overhead poles since no underground information was shown on the survey. Owner to <br /> confirm and provide additional SUE investigations on area utilities as needed. <br /> • Geotechnical and other subsurface investigations, construction testing or construction phase <br /> geotechnical services are not included; these fees will be the responsibility of the General <br /> Contractor or Owner. <br /> • Design or installation of entrance signs, only assistance with placement. <br /> • Administration of outside consultant's contracts for construction testing and coordination of their <br /> work. <br /> • Architectural or any other design services for the existing farmstead and associated outbuildings. <br /> • Architectural or MEP construction drawings for the Environmental Learning Center. <br /> • Design of a well to service the site with well water. <br /> ■ Deep Foundation Design for structures. <br /> • Individual or additional wetland permits. <br /> • Preparation or implementation of a wetland mitigation plan. <br /> • Providing documentation of avoidance and minimization or alternative site analysis for an <br /> Individual Wetland Permit. <br /> • Traffic signal design. <br /> • Traffic Impact Analysis. <br /> • Additional Park entrance from New Hope Church Road. <br /> • ADA certification of sidewalks and/or trails. <br /> • As-built survey data. <br /> • Irrigation Design. <br /> • Flood Studies. <br /> • Nutrient Removal BMP. <br /> • Easement/plat preparation and recording for stormwater water quality or detention <br /> BM P's. <br /> • Structural engineering such as design of bridges, boardwalks, headwalls, retaining walls or <br /> structures not listed above. <br /> • Cultural resourceslarcheological investigations. <br /> • Landscape maintenance plans. <br /> ■ Placing bid advertisements and associated fees. <br /> • Additional construction period site visits. <br /> • Plan reviews and revisions are included in the proposal as listed above. <br /> • Permit fees, unless listed above. <br /> • Multiple copies of plans for reviews other than those listed above. <br /> • Bid set printing other than listed above. <br /> • Fast track scheduling that would require overtime pay. <br /> • Assistance with grant or funding documentation or associated meetings. <br /> 3 <br />