Orange County NC Website
DocuSign Envelope ID:8880C4F3-E132-469D-9F1A-0516B69BADB7 <br /> 7l l West North Street <br /> Susan Raleigh, NC 27603 <br /> Hatchet Tel: 979.838.9600 <br /> Fax: 91 9.838.9700 <br /> Landscape Architecture, PLLC e-mail: susan@susanhatchell.com <br /> Proposal for Additional Services—Blackwood Farm Park Renovations <br /> January 27, 2020 <br /> Scope of additional work includes: Design, Permitting and Construction Administration of additional <br /> site work, a 2"waterline tap and water line extension, and an Amphitheater at about$400,000 with <br /> associated grading stormwater, and crushed screenings trail. <br /> Task I: Design Development, Construction Drawings, Permitting, Bidding, and Construction <br /> Administration of an Amphitheater, additional grading and stormwater, associated trails, 2"waterline <br /> tap and water line extension <br /> The following is the scope of work: <br /> SHLA-Susan Hatchell Landscape Architecture, PLLC <br /> TG—Timmons Group (formerly Ward Consulting Engineers) <br /> ECA—Ellen Cassilly Architect, Inc. <br /> NV5—NV5 (formerly Calyx Engineering) <br /> • SHLA will revise the current site plan and grading concept to include the final location of the <br /> amphitheater as well as a crushed screenings trail that can accommodate vehicular traffic from the <br /> farmstead to the amphitheater. Includes additional plan sheet to show site work. <br /> ■ TG will prepare additional sheets to show additional grading, storm drainage and erosion control <br /> for the extended limits of disturbance. <br /> • TG will incorporate the additional impervious area into the stormwater impact analysis. <br /> ■ TG will revise the utility plan to show a new 2-inch water tap to the existing line on NC86.A bore <br /> and jack will be required under the roadway as this is a primary roadway. <br /> • TG will provide an additional plan sheet and details to include appropriate metering, valves and <br /> backflow prevention for the new line. <br /> ■ SHLA will show location for park entrance sign on the site plan. <br /> ■ Additional erosion control measures will be added for the off-site work to be included in the permit <br /> submittal to the NC Land Quality Department. <br /> • Amphitheater 60% Design Development(ECA) <br /> o Prepare 60% DD Plans incorporating comments on 30% SD plans <br /> o Coordinate with team members including Structural, MEP and Civil <br /> o Architectural Cost estimate and outline specification <br /> ■ Amphitheater 100% Construction Documents {ECA} <br /> o Prepare 100% CD Plans incorporating comments on 60% DID plans <br /> o Coordinate with team members including Structurai, MEP and Civil <br /> o Two(2) design team meetings with Orange County{ECA and SHLA} <br /> o Architectural Cost estimate and final specifications <br /> • Architecture sheets to include: Appendix B, Coversheet Information, Foundation Plans, Floor <br /> Plans, Framing Plans, Roof Plans, Exterior Elevations, Wall Sections, Structural and MEP <br /> Engineering sheets to support the architectural drawings <br /> • Site electrical service will be provided to a transformer near the amphitheater. <br /> ■ SHLA, ECA, TG and NV5 will address comments for the additional work during the 60% and <br /> 100% submittal sets and the Orange County Plan Review process. <br /> 1 <br />