Browse
Search
2020-143-E AMS - Pine Shore Energy EV charging station replacements
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-143-E AMS - Pine Shore Energy EV charging station replacements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2020 8:21:10 AM
Creation date
3/19/2020 5:04:24 PM
Metadata
Fields
Template:
Contract
Date
2/18/2020
Contract Starting Date
2/12/2020
Contract Ending Date
6/30/2020
Contract Document Type
Agreement - Services
Amount
$89,335.07
Document Relationships
R 2020-143 AMS - Pine Shore Energy EV charging station replacements
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:82EFC9DB-7D47-4E7B-9162-C9CE62D9862C <br /> Scope of Work: SUBTOTAL 82,776.48 <br /> TAX 6,068.59 <br /> Provide twelve Clipper Creek L2 Pedestal mounted SHIPPING 490.00 <br /> EVSE to replace exiting EATON L2 units at three TOTAL $89,335.07 <br /> sites in Orange County. Existing units are all failing. <br /> New units shall include smart charging components <br /> and individual remote monitoring for detailed <br /> reporting on energy utilization and user interactions. <br /> Each EVSE shall have capability for connection into <br /> new statewide system based on open protocol and <br /> open source tecnologies. <br /> Pine Shore Energy LLC is Vendor for NC-State <br /> Contract 691 A - Electric Vehicle Charging Station <br /> Equipment, Accessories, Installation & <br /> Infrastructure. All work shall be performed in <br /> accordance with this contract. <br /> Payment Terms: <br /> 50% Project Mobilization <br /> 90% Substantial Completion <br /> 100% Final Inspections <br /> Accepted By Accepted Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.