Orange County NC Website
DocuSign Envelope ID:82EFC9DB-7D47-4E7B-9162-C9CE62D9862C <br /> Scope of Work: SUBTOTAL 82,776.48 <br /> TAX 6,068.59 <br /> Provide twelve Clipper Creek L2 Pedestal mounted SHIPPING 490.00 <br /> EVSE to replace exiting EATON L2 units at three TOTAL $89,335.07 <br /> sites in Orange County. Existing units are all failing. <br /> New units shall include smart charging components <br /> and individual remote monitoring for detailed <br /> reporting on energy utilization and user interactions. <br /> Each EVSE shall have capability for connection into <br /> new statewide system based on open protocol and <br /> open source tecnologies. <br /> Pine Shore Energy LLC is Vendor for NC-State <br /> Contract 691 A - Electric Vehicle Charging Station <br /> Equipment, Accessories, Installation & <br /> Infrastructure. All work shall be performed in <br /> accordance with this contract. <br /> Payment Terms: <br /> 50% Project Mobilization <br /> 90% Substantial Completion <br /> 100% Final Inspections <br /> Accepted By Accepted Date <br />