Orange County NC Website
DocuSign Envelope ID:90883988-076D-486D-B746-055E86E2D681 <br /> Proposal for CMT and Special Inspections Services Proposal Number:T19-0043 <br /> Detention Center, EAC and POB (Northern Campus Expansion) September 18, 2019 <br /> Hillsborough, North Carolina <br /> Overall, we understand that construction will primarily consist of: utility installation and re-location, <br /> earthwork grading,temporary storm basins and SCM construction,typical shallow foundations, reinforced <br /> cast-in-place concrete, structural masonry, structural steel framing, site paving and site work and <br /> hardscapes. We understand the contractor has received/or will receive NTP in September 2019 and <br /> construction will continue through to substantial completion in March 2021. <br /> We anticipate being onsite on a continuous to periodic basis during construction, as dictated by the <br /> project plans and specifications and Statement of Special Inspections,to perform the required observation <br /> and testing services. If any of our scheduling assumptions need to be altered, we will adjust accordingly <br /> based on a Time and Materials basis. <br /> SCOPE OF SERVICES <br /> Our scope of services is described below and provides the basis of our fee estimate. It should be noted <br /> our services will exclude: (1) supervision, direction, or acceptance of the contractor's work; (2) <br /> interpretation or modification of the project plans or specifications; (3)submittal of test results or reports <br /> to any regulatory agency (unless specifically requested by client in writing); or (4) job site safety. The <br /> following tasks outline our proposed scope of services for this project. <br /> Pre-Construction Meeting and Review of Project Documents <br /> Summit's Project Manager and supporting team members will attend a pre-construction meeting <br /> alongside the owner's representative, general contractor, and design team members to review <br /> requirements for the project prior to beginning construction activities. We have reviewed the project <br /> plans from a geotechnical perspective for conformance with recommendations provided in the final <br /> geotechnical report for the project. <br /> Geotechnical &Soils Observation and Testing Services <br /> Summit will provide a Special Inspections Agent or senior engineering technician working under the <br /> supervision of a registered engineer to observe proofrolls,subgrade preparation,footing installation,and <br /> to perform compaction testing services during onsite grading activities. We anticipate that the following <br /> observations and testing will be required during earthwork and associated construction for the following: <br /> • Site work and grading; <br /> • Utility trench backfill in structural areas; <br /> • Proofrolling operations; <br /> • Foundation observations and testing; <br /> • Subgrade preparation and compaction for grade slabs; and <br /> • Compaction testing of backfill material. <br /> Compaction testing following grading will be performed in general accordance with the project's <br /> geotechnical report and project documents. We anticipate we will be required to perform field density <br /> testing using American Society for Testing and Materials (ASTM) procedures. Our personnel will sample <br /> on-site and imported materials used as fill and transport these samples to our laboratory for testing. <br />