Browse
Search
Agenda - 03-10-20; 8-l - Schools Adequate Public Facilities Ordinance (SAPFO) – Receipt and Transmittal of 2020 Annual Technical Advisory Committee Report
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 03-10-20 Business Meeting
>
Agenda - 03-10-20; 8-l - Schools Adequate Public Facilities Ordinance (SAPFO) – Receipt and Transmittal of 2020 Annual Technical Advisory Committee Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 4:46:14 PM
Creation date
3/5/2020 4:20:20 PM
Metadata
Fields
Template:
BOCC
Date
3/10/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
8-l
Document Relationships
Agenda - 03-10-20 Business Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 03-10-20 Business Meeting
Minutes 03-10-2020 Business Meeting
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14 <br /> Future Residential Development <br /> Following the economic downturn, there has been an increase in approved and undeveloped <br /> residential projects in Orange County. Currently, there are over three thousand proposed single <br /> family and multifamily housing units approved,but undeveloped in the CHCCS district. In <br /> addition, there are over a thousand proposed residential units approved,but undeveloped in the <br /> OCS district. Proposed growth is not included in the SAPFO projection system until actual <br /> students begin enrollment. The Certificate of Adequate Public Schools (CAPS) test is conducted <br /> during the approval process at a certain stage. Once students are enrolled in a school year, <br /> through annual reporting of student membership numbers, 10-year student projections can be <br /> updated to display future capacity needs in time to efficiently plan for future school construction <br /> requests. Staff and the SAPFO Technical Advisory Committee continue to monitor and evaluate <br /> the demand and growth of residential development throughout Orange County as well as its <br /> effect on student membership rates. <br /> Below is a list of larger residential projects and the potential number of students from these <br /> projects which may have impact to the schools in the short term. Please note, the City of Mebane <br /> is not a party to the SAPFO agreement and therefore does not require that CAPS (Certificate of <br /> Adequate Public Schools)be issued prior to development approvals. As a result, the potential <br /> number of students is based on unit type and bedroom count estimates. <br /> Residential Project JurisdictionProposed <br /> Students <br /> Elementary: 84 <br /> Collins Ridge Phase 1 Hillsborough 672 Middle: 45 <br /> High: 57 <br /> Elementary: 36 <br /> Forest Ridge Hillsborough 233 Middle: 19 <br /> High: 26 <br /> Elementary: 28 <br /> Carraway Village Chapel Hill 400 Middle: 10 <br /> High: 14 <br /> Elementary: 44 <br /> Weavers Grove Chapel Hill 235 Middle: 18 <br /> High: 20 <br /> Elementary: 60 <br /> The Meadows Mebane 256 Middle: 31 <br /> High: 34 <br /> Elementary: 9 <br /> Stagecoach Corner Mebane 35 Middle: 5 <br /> High: 6 <br /> Bowman Village/ Elementary: 48 <br /> Bowman Place Mebane 177 Middle: 23 <br /> High: 30 <br /> v <br />
The URL can be used to link to this page
Your browser does not support the video tag.