Orange County NC Website
8 <br /> modeled), and the withdrawals would be over 15 miles downstream from the Eno River Gage at Hillsborough. <br /> It is clear from Figure 1 and from the hydrologic modeling results (see Scenario 4.3 in the attached report)that <br /> the agreed upon conditions for the City to fill Teer Quarry with water withdrawn from the Eno River that the <br /> City's operation of Teer Quarry will have absolutely no impact whatsoever on the Hillsborough Water System <br /> (Town of Hillsborough), the Orange-Alamance Water System, or Resco Products.The Eno River Water Users <br /> discussed this project at their annual meeting on August 30, 2019, and expressed no concerns. <br /> The ability to withdraw water from the Eno River for filling the Teer Quarry Reservoir is crucial for the City's use <br /> of Teer Quarry as a water supply. We request confirmation that the City's operating conditions for its use of the <br /> Teer Quarry Reservoir are in accordance with the Eno River Capacity Use Investigation Water Management <br /> Operations Plan. <br /> Sincerely, <br /> Donald F. Greeley, <br /> Director <br /> C: Marie Strandwitz, Utilities Director,Town of Hillsborough <br /> Ben Vaughn, General Manager, Orange-Alamance Water System <br /> Tonya Scarlett, Operations Manager, Resco Products <br /> 1600 Mist Lake Dr. Durham, NC 27704 919.560.4381 DurhamNC.gov Follow Us @CityofDurhamNC <br /> 00 0 <br />