Browse
Search
Agenda - 03-10-20; 6-a - Defining a Final Project Scope for County Space for the 203 South Greensboro Street Project in Cooperation with the Town of Carrboro
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2020
>
Agenda - 03-10-20 Business Meeting
>
Agenda - 03-10-20; 6-a - Defining a Final Project Scope for County Space for the 203 South Greensboro Street Project in Cooperation with the Town of Carrboro
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2020 4:40:54 PM
Creation date
3/5/2020 3:39:23 PM
Metadata
Fields
Template:
BOCC
Date
3/10/2020
Meeting Type
Business
Document Type
Agenda
Agenda Item
6-a
Document Relationships
Agenda - 03-10-20 Business Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2020\Agenda - 03-10-20 Business Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8 <br /> as follows: <br /> ARTICLE I <br /> Definitions <br /> The definitions contained in the Agreement are amended as follows, and except as <br /> amended herein shall remain unchanged: <br /> "Development" means the planning, design and construction of the Facilities on the Property <br /> located at 203 South Greensboro Street in Carrboro. <br /> "Facility" or"Facilities"means the improvements to be made at the Property pursuant to this <br /> Agreement. <br /> "Governing Body"means, with respect to the Town, the Town Council, and with respect <br /> to the County, the Board of County Commissioners. <br /> "Gross floor area" as used in this Agreement means the area of space within the building <br /> to be constructed on the Property occupied by each party to this Agreement, plus the proportional <br /> share of Common Areas attributable to each party (i.e., Common Areas shall be apportioned <br /> between the parties in proportion to the amount of "gross floor area" each occupies in the <br /> building or as otherwise determined and agreed to in writing by the Parties). The proportion of <br /> "gross floor area" occupied by each party shall be finally calculated upon completion of the <br /> construction plans for the Facilities to be constructed on the Property, and a written schedule <br /> (following in principle the Elements of Value Exhibit C) signed by each party shall be attached <br /> to this Agreement as an Addendum at that time. <br /> "Project" means the planning, design and construction of an approximately 50,000 gross <br /> square foot building, site improvements, and associated parking spaces and/or structure with <br /> adequate capacity for the Project. Project characteristics will include sustainable design and <br /> operation elements consistent with the adopted facility development principles of the Board of <br /> Orange County Commissioners attached as Exhibit B. The Parties also agree to incorporate the <br /> principles of value engineering during the design and construction process, thereby ensuring <br /> efficient design and use of both the initial construction capital and ongoing operations capital. <br /> Upon completion of the Project, the parties will convert the Facilities to a condominium form of <br /> ownership to be governed by covenants adopted by mutual agreement of the Parties. <br /> "Shared Areas" are designated areas owned by one Party that may be reasonably offered <br /> for use by other Parties according to a mutual agreement. <br /> ARTICLE II <br /> Description Of Development Agreement <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.