Browse
Search
Agenda 02-25-20 Attachment 2A - CHCCS Executive Summary Facilities-Capital-Maintenance and Operations
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2020's
>
2020
>
Agenda - 02-25-20 Joint Meeting with Schools
>
Agenda 02-25-20 Attachment 2A - CHCCS Executive Summary Facilities-Capital-Maintenance and Operations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2020 4:57:11 PM
Creation date
2/21/2020 4:58:20 PM
Metadata
Fields
Template:
BOCC
Date
2/25/2020
Meeting Type
Schools
Document Type
Agenda
Document Relationships
Agenda 02-25-20 Joint Meeting with School Boards
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2020's\2020\Agenda - 02-25-20 Joint Meeting with Schools
Minutes 02-25-2020 Schools
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2020's\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The district researched industry standards for facility capital funding for K-12 <br /> institutions and believes the annual allocation for capital funding currently received <br /> is below recommended levels to properly maintain facilities. Findings include the <br /> following annual capital allocations: <br /> • Recommended amount to "regularly upgrade existing facilities' <br /> systems, components, fixtures, equipment, and finishes as they <br /> reach the end of their anticipated life expectancy; systematically <br /> reduce the backlog of deferred maintenance that has accumulated; <br /> and alter existing facilities to respond to changing educational <br /> requirements." = $16,379,112 (1) <br /> • Recommended amount to make sure buildings are "clean and in <br /> good working order." = $12,284,334 (2) <br /> • The above are based on 3 & 4% of replacement costs. Utilizing a <br /> rate of combined 5% = $20,473,891 which is $12 million below <br /> current expenses. <br /> • The states with the lowest shares of M&O spending as a percentage <br /> of total budget were Georgia (7.6 percent), Minnesota (7.7 percent), <br /> and North Carolina (8.1 percent). Those with the highest shares <br /> were Oklahoma (11.1 percent), Arizona (12.1 percent), and Alaska <br /> (12.9 percent). CHCCS is at 9.6% (3) <br /> • The states that spent the least per student on M&O were Utah <br /> ($614), Idaho ($639), and North Carolina ($733). At the other end <br /> of the range were Alaska ($2,096), New Jersey ($1,923), and New <br /> York ($1,759). (4) <br /> Footnotes <br /> 1. Calculated using Current Replacement Value (CRV)x Gross Sq Ft. x 4% = $192 x <br /> 2,132,697 x 192 x .04 = $16,379,112. Source: State of Our Schools <br /> 2. 3% of CRV Source: State of Our Schools <br /> 3. CHCSS Budget line of"Operational support services" / Total operating expense = <br /> 13,831,080 / 144,247,500. 9.56% was average share of M&O for schools nationwide <br /> in 2008-2009- includes payroll for M&O. Source:American Schools and Universities <br /> M&O Cost Study <br /> 4. See page 15 of State of Our Schools <br />
The URL can be used to link to this page
Your browser does not support the video tag.