Browse
Search
2020-127-E AMS - Gurlitz Architecture VB renovation design
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-127-E AMS - Gurlitz Architecture VB renovation design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/19/2020 9:41:23 AM
Creation date
2/19/2020 9:31:51 AM
Metadata
Fields
Template:
Contract
Date
2/13/2020
Contract Starting Date
2/13/2020
Contract Ending Date
5/31/2020
Contract Document Type
Agreement - Services
Amount
$10,000.00
Document Relationships
R 2020-127 AMS - Gurlitz Architecture VB renovation design
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br />III CONSTRUCTION DOCUMENT PHASE <br /> <br /> A) During the Construction Document Phase JGA will provide the following services: <br /> <br /> 1) Prepare Construction Documents to include detailing as required. Construction documentation <br />will be developed with the intention of bidding this project as an interior project under the <br />North Carolina “Existing Building” for a type 2 alteration. In the event structural, mechanical, <br />electrical , plumbing or civil engineering (detailed site plans) drawings are required by the scope <br />of the project or by regulatory agencies JGA will solicit engineering proposals based on the <br />scope of work. This engineering work will be considered an additional service under the <br />contract. <br /> <br />IV CONTRACTOR NEGOTIATION PHASE <br /> <br /> A) During the Negotiation Phase JGA will provide the following services <br /> <br /> 1) Coordinate with the Owner to facilitate contractor negotiation and an Agreement with a <br />contractor for execution of the work. <br /> <br />V ADMINISTRATION OF THE CONSTRUCTION CONTRACT <br /> <br /> A) During the Construction Administration phase JGA will provide the following services: <br /> <br /> 1) Site inspections and attendance at regular construction Owner/Architect/Contractor meetings. <br /> 2) Review of contractor payment requests and certification of such requests. <br /> 3) Comments on RFI’s, PCO’s and other requests from the contractor(s), <br /> 4) Advice and recommendations regarding construction issues to the Owner. <br /> <br /> <br />FEE PROPOSAL <br /> <br />PHASE I-II: Hourly based on attached, 2020, rate schedule <br /> $10,000.00 maximum fee without written fee revision. <br />PHASE III-V: Negotiated fee based on scope and consultants required. <br /> <br />________________________________________________________________________________________________ <br /> <br />The signatures below will indicate the agreement by Architect and Owner to the terms of this proposal. The intention of <br />both Architect and Owner is to execute a formal Agreement for these services. <br /> <br />______________________________ <br />For: Orange County For JGA: Josh Gurlitz, <br /> <br />DocuSign Envelope ID: 73666755-B5EF-4CA1-8A35-466EB130D0DC
The URL can be used to link to this page
Your browser does not support the video tag.