Browse
Search
2020-119-E IT - Columbia Telecommunications extend fiber to AS
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-119-E IT - Columbia Telecommunications extend fiber to AS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/14/2020 2:24:19 PM
Creation date
2/14/2020 1:49:15 PM
Metadata
Fields
Template:
Contract
Date
1/20/2020
Contract Starting Date
1/20/2020
Contract Ending Date
6/30/2020
Contract Document Type
Agreement - Services
Amount
$55,000.00
Document Relationships
R 2020-119 IT - Columbia Telecommunications extend fiber to AS
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CTC Proposal to Orange County – Public Works to Animal Services <br />Page 7 <br /> <br />x Review contractor construction management and safety plans <br />x Develop quality assurance inspection checklists to facilitate construction oversight <br />x Perform on-site inspection during construction for safety and workmanship <br />x Perform on-site post-construction inspection for compliance with the approved designs <br />and workmanship, to include a detailed review of accuracy and completeness for a <br />sampling of as-built documentation provided by the Contractor; this may include verifying <br />slack loop cable lengths; verifying proper bonding/grounding; and verifying location of <br />outside plant assets (splice enclosures, slack loops, handholes, etc.) using precision GPS <br />receivers <br />x Review all Contractor-provided fiber optic performance test data, and perform <br />independent testing (OTDR and power meter) for a suitable sampling to validate <br />Contractor-provided test data <br />x Review Contractor’s construction invoices for consistency with design and observed <br />construction progress <br />x Prepare a comprehensive report documenting the results of our test data review, <br />independent testing, and post-construction inspection to provide verification that the <br />network, as installed, is suitable for the County's purposes and conforms to the approved <br />final design <br />CTC anticipates that up to a week of on-site inspection during construction will be required with <br />an additional day for post-construction inspection and fiber testing. <br /> <br />DocuSign Envelope ID: FDEE3CE5-2218-4290-8CC7-E06D1211E72A
The URL can be used to link to this page
Your browser does not support the video tag.