Orange County NC Website
CTC Proposal to Orange County – Public Works to Animal Services <br />Page 7 <br /> <br />x Review contractor construction management and safety plans <br />x Develop quality assurance inspection checklists to facilitate construction oversight <br />x Perform on-site inspection during construction for safety and workmanship <br />x Perform on-site post-construction inspection for compliance with the approved designs <br />and workmanship, to include a detailed review of accuracy and completeness for a <br />sampling of as-built documentation provided by the Contractor; this may include verifying <br />slack loop cable lengths; verifying proper bonding/grounding; and verifying location of <br />outside plant assets (splice enclosures, slack loops, handholes, etc.) using precision GPS <br />receivers <br />x Review all Contractor-provided fiber optic performance test data, and perform <br />independent testing (OTDR and power meter) for a suitable sampling to validate <br />Contractor-provided test data <br />x Review Contractor’s construction invoices for consistency with design and observed <br />construction progress <br />x Prepare a comprehensive report documenting the results of our test data review, <br />independent testing, and post-construction inspection to provide verification that the <br />network, as installed, is suitable for the County's purposes and conforms to the approved <br />final design <br />CTC anticipates that up to a week of on-site inspection during construction will be required with <br />an additional day for post-construction inspection and fiber testing. <br /> <br />DocuSign Envelope ID: FDEE3CE5-2218-4290-8CC7-E06D1211E72A