Orange County NC Website
2 <br /> <br />Building setbacks for front (40’), side (20’), and rear (20’) have been added. <br />7. Is any signage proposed? If so, indicate sign location on site plan. <br />A small wooden or vinyl entry sign has been added to the entry to the project. It is outside of the public <br />right of way and far enough back to not interfere with sight distance at the Atkins Road driveway. <br />8. Per Section 2.5.3 (Q), show existing contour lines as dashed and proposed contour lines as solid. Show <br />at 5’ intervals with 10’ contours in bold. <br />We will change the surface to show 5’ intervals and bold the 10’. <br />9. Are limits of disturbance (LD) the same as the tree protection fencing line (TP)? Show LD on site plan. <br />Yes. The LD is the TP fence line. We have shown and labeled it. <br />10. Add the method of disposal of trees, limbs, stumps, and construction debris associated with the <br />permitted activity to the plan itself. Also, put the following note: “open burning of trees, limbs, stumps, <br />and/or construction debris is expressly prohibited.” <br />The limits of disturbance will be flagged and tree fence will be installed. The area of disturbance will <br />be logged and any significant timber will be removed by the timber company. Smaller trees and stumps <br />will be ground to mulch and sold or hauled offsite. A note has been added to the drawings. See general <br />note #6. <br />11. As staff understands it, you intend to subdivide the property later on and use the remainder for <br />residential development. Do you know how many acres you plan to reserve for the lacrosse facility? <br />Consider putting that information on the site plan. If not, you may need to modify the SUP later on before <br />being able to subdivide. <br />We have shown a future property line for the subdivision. We have called out the lot areas and we <br />have verified the impervious surface percentages for the lacrosse lot is below the 12% maximum. <br /> <br />III.UDO Section 5.7.2 – Standards for Recreational Uses (Recreational Facilities) <br />1. Put a note on the site plan that no lighting is proposed. Should you require lighting at a later date <br />(temporary or permanent), you will need to modify the SUP at that time. <br />See General Note #7. <br />2. Include the number of anticipated participants. <br />The maximum number of participants for any given time is 400. <br />3. Submit a signed letter from the owners and operators that the project will not have an adverse effect on <br />the adjacent properties (UDO Sec. 5.7.2 (C) (1) (e)). <br />The letter has been drafted and the owners are signing it. An original copy will be sent to the O.C. <br />Planning Department to Molly’s attention. <br /> <br />