Browse
Search
IPWG agenda 120700
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Intergovernmental Parks Work Group
>
Agendas
>
2000
>
IPWG agenda 120700
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 3:25:33 PM
Creation date
2/6/2020 3:05:54 PM
Metadata
Fields
Template:
BOCC
Date
12/7/2000
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
266
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SccnnnaY3� of Capital Projects .F <br /> — FYI through Y2004- 05 <br /> The Town, due to limited resources over the next five years , must prioritize the capital <br /> needs identified in the Capital Improvement Program that was submitted to the Board on <br /> November 4 , 19996 <br /> ts remain unfunded over the next five years . <br /> The following projec <br /> �- S 797 , 635 Fire Department Renovations <br /> p $ 257000 Fiber Optic Cabling — Seed money for long- range plan <br /> a $ 4 , 855 , 315 Outdoor Swimming Pool <br /> -- $ 3 ,2421671 Town Hall Renovations <br /> $ 72 , 114 Sculpture Project <br /> $ 76 , 643 Tree Planting Project <br /> $ 2 , 9971952 Greenways <br /> �- $ 769 , 341 Local Road Improvements <br /> 3627398 Playground Equipment <br /> $ 33788 , 688 . Gymnasium <br /> $ - 645359 , 307 Northern Community Park <br /> $23, 347, 064 TOTAL UNFUNDED <br /> Several projects have been modified in scope until future revenue streams can be <br /> identified . The projects and their funded scope include : <br /> Smith Middle School — Funded initial phase of athletic field construction . 'Town has <br /> submitted draft of a formal joint arrangement with the schools and is awaiting its return . <br /> Small Park (Hillsborough Road) — Land purchase and design study for future <br /> development of the park (in the event that grant funding or other funding becomes <br /> available) <br /> Public Works Facility - .Land purchase only . <br /> Sidewalks At Board � direction, sidewalk fiunding includes contribution to Hannah St. <br /> 1sidewalk and fands for a sidewalk on Autumn Drive when a connector road is built <br /> Bikeways — Entire project funded ; increased intergovernmental share anticipated for <br /> Roberson Place bikepath project <br /> Town* Parking Lots — Purchase of one parking lot versus three requested <br />
The URL can be used to link to this page
Your browser does not support the video tag.