Orange County NC Website
V � <br /> • Operation and maintenance training : The building will have sophisticated mechanical systems and <br /> controls serving a high moisture content space with constartt indoor air quality management <br /> needs . A complete documentation and training program is required to train current and future <br /> Town maintenance and pool staff in all aspects of the systems operation and maintenance <br /> responsibilities . <br /> SUMMARY <br /> The inclusion of energy efficiency and renewable energy features will result in additional commissioning <br /> and construction costs that need to be incorporated and maintained in the project budget. Depending on <br /> the package of features incorporated , the energy features can be roughly expected to add 4-7 % to <br /> construction costs . In large part this added cost is mandated by the Town energy ordinance . Much of this <br /> investment will be paid back to the Town in less than ten years in avoided energy and water costs . The <br /> Town will also realize comparable savings from reduced maintenance and # facility replacement costs ' in the <br /> decades to come . <br /> s <br />