Browse
Search
JMRPWG agenda 102898
OrangeCountyNC
>
BOCC Archives
>
Advisory Boards and Work Groups - Inactive
>
Joint Master Recreation and Parks Work Group
>
JMRPWG agenda 102898
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 5:15:47 PM
Creation date
2/5/2020 5:12:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i E i <br /> 3 . Commission and analyze new Soil Core Testing report of existing property to determine <br /> whether or not the existing base will permit construction of competition oriented Melds and <br /> building structures . <br /> 4 . In. temew all key personnel who are immediately involved in the project and / or will control <br /> usage of the facility ( as determined by the Client) and develop a P rofframminc- document <br /> outlining, the specific program criteria by the anticipated user groups . <br /> 6 Coordinate schematic d 'eszn session with Client during which desip options and <br /> developmental schematic plans are prepared on CAD through a workshop format . <br /> 7 . Develop and submit a pz=o , planning , and cost model report based on : <br /> Property Boundaries and Limitations <br /> Schematic Design <br /> Program Checklist - <br /> Test and Survey Results <br /> Engineering Principles <br /> Analysis of Similar Parks and Trends in the Region <br /> Revenue Generation Prospects - <br /> Professional Recommendations <br /> - _ - After the report is reviewed; the Team will provide uR--to two follow- up sessions and briefs to <br /> respond to any questions , comments and/ or concerns as a part of the Feasibility Study . The <br /> Team will also make a presentation of its findings as requested . Any further assignments will <br /> - be considered a part of Phase ? , and not covered by this proposal . <br /> i <br /> 9 . The Feasibility Study shall be completed within 90 days of Notice to Proceed. <br /> SPORTS FACILITY CONSULTING PROPOSAL Paae 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.