Browse
Search
JMRPWG agenda 052599
OrangeCountyNC
>
BOCC Archives
>
Advisory Boards and Work Groups - Inactive
>
Joint Master Recreation and Parks Work Group
>
JMRPWG agenda 052599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 5:11:37 PM
Creation date
2/5/2020 4:59:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/ 26/ 99 <br /> the population increases ) . <br /> A . program for land acquisition for long - term park needs <br /> should be developed . that identifies sites that could meet <br /> needs ( including potential for siting active and low - impact <br /> recreation ) , based on projected size and location _.of <br /> parkland throughout the county . The availability of <br /> matching funds from1he benefiting jurisdictions should + be <br /> an important component in future acquisition and park <br /> development . The , program should also identify an acreage <br /> threshold for co - located school /park land acquisition and <br /> should be developed with the Parks and Resource Lands <br /> Council and the Schools/ Land Use Council . <br /> h - <br /> To address the estimated $ 10 . 12 million in future park <br /> needs , the following actions should be taken to use <br /> existing bond funds and address long - term needs . <br /> 1 . The remaining $ 2 . 89 million : in land acquisition funds <br /> from the 1997 parks bond - should be used - for <br /> acquisition of lands identified as sites for long - term <br /> parks use as soon as . possible . <br /> 2 . The balance of funding should be an estimated $ 8 <br /> million parks bond placed before the voters in <br /> November 2000 , As previously -discussed , the specifics <br /> of this bond should be coordinated by the Parks and <br /> Resource Lands Council . <br /> Developing a program for identifying and acquiring long - <br /> term park sites at this time will greatly reduce the cost of <br /> meeting Long - term park needs . <br />
The URL can be used to link to this page
Your browser does not support the video tag.