Browse
Search
JMRPWG agenda 052599
OrangeCountyNC
>
BOCC Archives
>
Advisory Boards and Work Groups - Inactive
>
Joint Master Recreation and Parks Work Group
>
JMRPWG agenda 052599
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 5:11:37 PM
Creation date
2/5/2020 4:59:08 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
225
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/ 26/ 99 <br /> Current Projects / Ongoing Improvements <br /> • Acquisition and renovation of Carrboro Baptist Church building for <br /> Carrboro Community Center <br /> 4 . Town of Hillsborough <br /> • $ 254 , 000 from the Clean Water Management Trust Fund for Eno <br /> Riverwalk Stream Buffers <br /> • $ 3. 1 , 500 for Occoneechee Mountain park ( plus $ 37 , 500 in other <br /> funds ) <br /> Current Projects : t <br /> Cooperative projects between Hillsborough and Orange County <br /> River Park - Approximately 5 . acres of county land located in . <br /> downtown Hillsborough between the new courthouse and river is being <br /> planned for an urban park and open space . The. town . has .pledged <br /> $ 50 , 000 for this effort . At � least $ 25 , 000 has been spent and the <br /> remainder is available when the . county is ready to proceed . . A re - <br /> creation of the Occon-eechi village is being constructed on the site . <br /> RC &D is prepared to assist. with an erosion mitigation project along <br /> Still House Creek within -the park . Further planning and development , <br /> funds are . needed for implementation of the proposed master plan . <br /> Fairview Park - An engineering study is needed to evaluate the <br /> possible impacts of an old landfill and general soil conditions of the - <br /> combined county and town properties on the feasibility of a major <br /> sports facility . The estimated cost of the study is $ 46 , 000 . <br /> Hillsborough projects <br /> Occoneechee Park - Trails have been built by volunteers within the <br /> original 28 acres with funds from . Adopt- a -Trail Grants and from the <br /> Town . Development plans for . an overlook within the 28 acres, : a small <br /> parking and picnic area on a fee- simple parcel next to Eno Mountain <br /> Road , and a 1/4 mile accessible trail on an easement . parallel to the <br /> Eno River .that would <br /> connect the two was expected to be implemented _ <br /> in � 1999 using a NC Parks and Recreation Trust Fund ( PARTF) grant <br /> ( $ 31 , 500 ) and other funds totaling . $ 69 , 000 . An upcoming Lease . <br /> agreement between . N . C : Parks and Recreation and Hillsborough , to <br /> combine -the . management of Occoneechee park with the newly - <br /> acquired state park lands on Occoneechee Mountain ; will negate plans <br /> to build the parking lot and trail . The PARTF grant and other funds - ' ' <br /> totaling 4 $ 69 ,000 have been . allocated ' for the above development . . Due <br /> to - the 2 - year elapsed time of the original estimate additional funds <br /> may be needed for completion . An additional $ 13 , 000 has been . <br /> requested . <br /> Gold Park/ Old Ball Park - Twenty - four acres at the south end of <br /> 94 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.