Orange County NC Website
ECONOMIC DEVELOPMENT DISTRICT TRANSPORTATION WORKGROUP <br /> RECOMMENDATIONS <br /> Notes from Transportation Work Group retreat <br /> Hillsborough House Inn <br /> August 18 , 2001 <br /> Recommendations from the group <br /> Comments to NCDOT regarding Elizabeth Brady Road <br /> ( note , the group did not re -vote after additional alternatives were offered ) : <br /> The seven options being studied in priority order by what is preferred by the work group : <br /> 1 . Elizabeth Brady alignment 3 , which does not cross the river , goes across ridge ( IF this is the <br /> least impact to the river) <br /> 2 . Elizabeth Brady alignment 2 ( averts racetrack , crosses river) <br /> 3 . ( original ) Elizabeth Brady alignment 1 <br /> 4 . Lawrence Road (with 86 connector ) but different function from above <br /> 5 . Western bypass <br /> 6 . No build <br /> 7 . Widen Churton St . from 70 business to 70 bypass <br /> Additional comments : <br /> ➢ Expand the DOT study area to the entire 50 -year water and sewer boundary from the town plan <br /> ➢ Have DOT continue with its existing list of options <br /> ➢ Add the consultant ' s current study area boundary as a 8t�' alternative , adjusted as needed and <br /> using existing roads where possible <br /> ➢ Design the Elizabeth Brady road extension to minimize the impact on the Eno River , even if it <br /> reduces mobility <br /> ➢ Treat Elizabeth Brady Rd . as a local road , not a bypass <br /> ➢ Treat Lawrence Rd . option as having a different function from Elizabeth Brady , to move through <br /> traffic around , not through , downtown <br /> ➢ Develop a new interchange of 1 ~ 85 east of Lawrence Rd . to create possible bypass alternative <br /> ➢ Do other non - road fixes on Churton Street to address congestion & safety , too <br /> Other Recommendations. All include bike and pedestrian features ( not in priority order) <br /> Amend current plans : <br /> 1 . Amend Western Bypass to begin near US 70 connector from 1 . 85 and delete King Edward <br /> Road extension from plan . <br /> Extend existing roads : <br /> 2 . Extend Lawrence Rd . south and west to connect with NC86 at the Old / New 86 connector <br /> 3 . Extend Palmers Grove Church Road south to new interchange on 185 and continue south to <br /> connect with New Hope Church Rd . <br /> 4 . Extend NC 86 west at Churton Street to run parallel with railroad and connect to Eno Street at <br /> Nash Street <br /> 5 . Extend Orange Grove Road east to US 70 business <br /> 6 . Extend JJ Freeland Memorial Drive east to Valley Forge Road <br /> 7 . Realign and extend Old NC 10 to connect the access road through Hampton Pointe & cross <br /> railroad to provide access to Beckett ' s Ridge and through to Oakdale Drive <br /> New road alignments : <br />