Orange County NC Website
ORANGE COUNTY TRANSPORTATION PRIORITY LIST <br /> 2006 - 2012 TRANSPORTATION IMPROVEMENT PROGRAM <br /> Chapel Hill to Hillsborough is experiencing increasing numbers of bicyclists <br /> using this route and there are also two schools along this route . This route is <br /> listed as priority I of the primary bicycle routes proposed in the Orange <br /> County Bicycle Transportation Plan adopted April 6 , 1999 . This project is <br /> listed in the 2002 - 2008 TIP , as an incidental bicycle need . Orange County <br /> requests that bicycle lanes be constructed as an independent project , and , if <br /> necessary , programmed in phases . <br /> 4 . Old NC 86 ( SR 1009 ) Bicycle Lanes : Construct bicycle lanes ( 4400t paved <br /> shoulders ) from Carrboro ( Eubanks Road ) to Hillsborough ( 1 -40 ) . This <br /> project , from the Carrboro Transition area ( Hickory Forest Road ) to Lafayette <br /> Drive , is priority 6 of the primary bicycle routes listed in the Orange County <br /> Bicycle Transportation Plan , and would extend bicycle accommodations <br /> requested in TIP Project R - 2825 to Carrboro , where its Transportation <br /> Advisory Committee has also established bicycle routes on Old NC 86 as a <br /> transportation priority connection between proposed bicycle facilities along <br /> Old Fayetteville Road , Homestead Road and Eubanks Road . <br /> The feasibility study for TIP Project R - 2825 , improvements to South Churton <br /> Street , recommends a four- lane divided section for Old NC 86 ( S . Churton <br /> St . ) from 1 . 40 to Lafayette Drive . That study also anticipates accommodations <br /> for bicycles (wide outside lanes ) from 1 -40 to 1 - 85 . This project would connect <br /> bicycle facilities proposed in the South Churton Street project to Carrboro . <br /> Carrboro ' s Transportation Advisory Committee has recommended bicycle <br /> lanes along Old NC 86 in two separate requests for Carrboro ' s Priority List for <br /> the 2006 - 2012 TIP : <br /> • from Old Fayetteville Road to Homestead Road ; and <br /> • from Homestead Road to Eubanks Road . <br /> 5 . R- 2825 , Improvements to South Churton Street : Develop congestion <br /> management , limited access , aesthetic and capacity improvements between <br /> US 70 Business and Interstate 40 . The portion between Interstates 40 and <br /> 85 will conform to the design criteria of the Economic Development District <br /> Design Manual ( 4 - lane divided section with bike and pedestrian <br /> improvements ) . The feasibility study completed in February 2002 <br /> recommends a 4 - lane divided , with 16400t median , curb and gutter cross <br /> section for the entire corridor from 140 to Eno River . Orange County stresses <br /> the need to study improvements within the current right- of-way for the <br /> segment north of Interstate 85 . Improved capacity through widening is not <br /> the County ' s first choice because of significant constraints between Interstate <br /> 85 and US 70 Business and the proximity of the historic district north of the <br /> project limits . Orange County requests that , where conditions do not prevent <br /> the addition of frontage roads , the feasibility study include the addition of <br /> frontage roads with limited access from the corridor . <br /> 2 <br />