Browse
Search
2020-089-E AMS - Summit Whitted stormwater mitigation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-089-E AMS - Summit Whitted stormwater mitigation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 2:59:04 PM
Creation date
2/5/2020 2:21:40 PM
Metadata
Fields
Template:
Contract
Date
2/4/2020
Contract Starting Date
2/4/2020
Contract Document Type
Agreement
Amount
$77,490.00
Document Relationships
R 2020-089 AMS - Summit Whitted stormwater mitigation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8433EODF-BA45-445A-8ECO-92271C65CC98 <br /> 13.2 All of the Designer's contracts with its Consultants shall be in writing and shall expressly provide that if this <br /> Agreement is terminated for any reason,the ❑wner may,at its sole option, take the assignment of the Consultants' <br /> contract with the Designer,that such assignment shall automatically take place upon notification in writing by the <br /> Owner to the Consultants and the Consultants shall continue to be bound by the contract after such assignment. A copy <br /> of each contract between the Designer and a Consultant shall be furnished to the Owner within seven (7) days of its <br /> execution. <br /> ARTICLE 4 <br /> BASIC SERVICES <br /> 4.1 Basic Services <br /> 4.1.1 The Designer shall perform as Basic Services the work and services described herein and in Attachment B to this <br /> Agreement. <br /> 4.11 The Basic Services will be performed by the Designer in the phases described in Attachment B. <br /> 4.1.3 The Owner shall have the right and option to require the Designer to prepare 1 separate bid packages with no <br /> additional compensation due the ❑esigner.Such bid packages must be approved by Owner prior to submission and, at <br /> the Owner's option, may include but not be limited to: <br /> A. Demolition and preliminary site work; <br /> B. General work, plumbing, mechanical,electrical,fire protection; <br /> C. Landscaping and irrigation; <br /> D.Signage; <br /> E. Furniture. <br /> F. Water and sewer infrastructure <br /> G. N/A <br /> 4.2 Proiect Cost Estimates <br /> 4.2.1 At the times designated herein, the Designer shall develop an estimate of the total cost of the Project(the"Total <br /> Project Cost"), including Designer's fees, costs of the construction, costs of equipment,furnishings,furniture and <br /> signage, permit fees and appropriate contingencies, and exclusions,where applicable.These costs shall be prepared and <br /> submitted to the Owner substantially in the format shown in Attachment C to this Agreement,with supporting <br /> documents listing quantities, unit price, labor rates, man-hour estimates, overhead and profit. Total Project Cost shall <br /> be mutually agreed upon by Owner and Designer as noted in paragraph 4.2.4. The timing of this Total Project Cost <br /> agreement shall be identified as a milestone in Attachment D. If cost estimating is not part of the project scope,the <br /> Total Project Cost shall be specified here: [BLANK] <br /> 4 <br /> Revised 11/19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.