Orange County NC Website
DocuSign Envelope ID:8433EODF-BA45-445A-8ECO-92271C65CC98 <br /> COMPENSATION <br /> SUMMIT agrees to provide professional services as outlined above in the Scope of <br /> Services. ❑ur fee proposal is based on man-hour projections and applicable billing <br /> rates for the scope of work and schedule as described and anticipated for this <br /> project. SUMMIT proposes a lump sum fee to be invoiced monthly on a percent <br /> complete basis, with payment due upon receipt. <br /> SCOPE OF SERVICES - Board Of Elections FEE <br /> TASK 1 - Due Diligence / Schematic Design - Concept Report $2,500 <br /> TASK 2 - Detailed Design $13,800 <br /> TASK 3 - Contract Documents and Sid Assistance $5,000 <br /> Atlas Engineering Includin 1511/o markup 12 200 <br /> Geotechnical $4,000 <br /> Cumming Cost Estimating $5 500 <br /> TOTAL FEES $44,000 <br /> SCOPE OF SERVICES - Sheriff's Office FEE <br /> TASK 1 - ❑ue Diligence / Schematic Design - Concept Report 500 <br /> TASK 2 - Detailed Design 500 <br /> TASK 3 - Contract Documents and Bid Assistance $1 000 <br /> Atlas Engineering Including 15% markup $10 500 <br /> Geotechnical $3,000 <br /> Cumming Cost Estimating $2 000 <br /> TOTAL FEES $17,500 <br /> SCOPE OF SERVICES - Whitted Building FEE <br /> TASK 1 -- Due Diligence / Schematic Design - Concept Report $8,500 <br /> TASK 2 - Detailed Design $34,000 <br /> TASK 3 - Contract ❑ocuments and Bid Assistance $5 000 <br /> Atlas Engineering Includin 15% markup $14 300 <br /> Geotechnical $5,000 <br /> Cumming Cost Estimating 7 000 <br /> TOTAL FEES $73,800 <br /> ��ir'i <br />