Browse
Search
2020-089-E AMS - Summit Whitted stormwater mitigation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-089-E AMS - Summit Whitted stormwater mitigation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 2:59:04 PM
Creation date
2/5/2020 2:21:40 PM
Metadata
Fields
Template:
Contract
Date
2/4/2020
Contract Starting Date
2/4/2020
Contract Document Type
Agreement
Amount
$77,490.00
Document Relationships
R 2020-089 AMS - Summit Whitted stormwater mitigation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8433EODF-BA45-445A-8ECO-92271C65CC98 <br /> Item on Form Definition <br /> Attach basis and justification for estimate. Include description,quantities,units, <br /> CURRENT ESTIMATED CONSTRUCTION COST special features,similar cost on recent projects,etc. <br /> A. 1.Demolition Includes but may not be limited to lead and/or asbestos testing and removal,building <br /> or interior space demolition in whole or part. <br /> A.2.Site Work Includes but may not be limited to grading,excavating,poor soils and/or rock <br /> removal,utilities relocation,roads,walks,parking,streambank repairs,stormwater <br /> management,retaining walls,rainwater harvesting systems, landscaping. <br /> Attach explanation of any special building,mechanical,or electrical service <br /> B.1.Utility Services requirements with appropriate distance to existing buildings,water,gas,electrical or <br /> other utility service. <br /> B.S. Associated Construction Costs Includes but may not be limited to construction fire alarm testing,utility shut downs, <br /> utilities,signage,security,displaced parking,staging,lock cores,keys,permits. <br /> B. 10. Other list other signficant sources of cost not included elsewhere. Additional lines may be <br /> added if needed. <br /> PRECONSTRUCTION Includes but may not be limited to land surveys,lead/asbestos surveys, <br /> COSTS environmental assessments,copying,postage,costs of print advertising,and <br /> destructive testing. For CM at Risk,preconstruction costs are consistent with the <br /> requirements of the preconstruction services agreement. <br /> CONTINGENCIES Unanticipated or unforseen conditions including but not limited to design error and <br /> omissions,concealed site conditions,utility conflicts,and extended overhead <br /> resulting from weather or other delay. <br /> 21 <br /> Revised 11/19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.