Orange County NC Website
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
DocuSign Envelope ID:8433EODF-BA45-445A-8ECO-92271C65CC98 <br /> Attachment C - Format of Total Project Cost Estimate <br /> ORANGE COUNTY <br /> Attachment C---Project Cost Estimate <br /> PROJECT <br /> IDENTIFICATION: <br /> PROJECT CITY or LOCATION: <br /> (Definitions/explanations are provided on pg 2 to assist in completion of this <br /> form.) <br /> CURRENT ESTIMATED CONSTRUCTION COSTS OTY UNIT COST PER UNIT TOTAL <br /> A. Site Preparation <br /> 1, Demolition $0 <br /> 2. Site Work $0 <br /> B. Construction <br /> 1. Utility Services $0 <br /> 2. Building Construction(new space) $0 <br /> 3. Building Construction(existing) $0 <br /> 4. Plumbing(new space) $0 <br /> 5. HVAC(new space) $0 <br /> 6. Electrical(Includes TV&Radio Studio) $0 <br /> 7. Fire Supression and Alarm Systems $0 <br /> 8. Telephone,Data,Video $0 <br /> 9. Associated Construction Costs $0 <br /> 10. Other: $0 <br /> C. Equipment <br /> 1. Fixed $0 <br /> 2. Moveable $0 <br /> ESTIMATED CONSTRUCTION COSTS $0 <br /> Items below may be calculated by percentage or lump sum. If using lump sum,make entry in$field. <br /> DESIGN FEE % (%of Estimated Construction Costs) $0 <br /> PRECONSTRUCTION <br /> COSTS % (%of Estimated Construction Costs) $0 <br /> CONTINGENCIES % (%of Estimated Construction Costs) $0 <br /> ESTIMATED COSTS (%of Estimated Construction Costs+Contingencies+Design Fee) $0 <br /> Escalation=percent per month multiplied by number of months <br /> (From Est.Date to mid-point of construction)= months %per month <br /> ESCALATION COST INCREASE (Total of Estimated Casts x Escalation%) $0 <br /> ESTIMATED TOTAL PROJECT COSTS (Estimated Costs+Escalation Cost Increase if any) $0 <br /> APPROVED BY: TITLE DATE <br /> DEFINITIONS <br /> 24 <br /> Revised 11/19 <br />