Browse
Search
2020-089-E AMS - Summit Whitted stormwater mitigation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2020's
>
2020
>
2020-089-E AMS - Summit Whitted stormwater mitigation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 2:59:04 PM
Creation date
2/5/2020 2:21:40 PM
Metadata
Fields
Template:
Contract
Date
2/4/2020
Contract Starting Date
2/4/2020
Contract Document Type
Agreement
Amount
$77,490.00
Document Relationships
R 2020-089 AMS - Summit Whitted stormwater mitigation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:8433EODF-BA45-445A-8ECO-92271C65CC98 <br /> entered into by the Owner and the Designer and providing for additional compensation for such additional services <br /> relating to the Project shall be deemed to be Basic Services provided without additional compensation. <br /> ARTICLE 2 <br /> DEFINITIONS <br /> 2.1 Definitions <br /> 2.1.1 Additional Services—Those services to be performed by Designer beyond the Basic Services. See Section 1.1.4 <br /> and Article S. <br /> 2.1.2 Basic Services—Those services to be performed by Designer as outlined in Attachment B. See Article 4 and <br /> Attachment B. <br /> 2.1.3 Compensation for Basic Services—Those fees to be paid by Owner for Basic Services. See Section 7.1 and 7.2. <br /> 2.1.4 Contractor—The construction contractors). <br /> 2.1.5 Consultants—Subconsultants, partners and other entities working with or on behalf of the Designer. See <br /> Section 3.3.1 and Attachment E. <br /> 2.1.6 Board of County Commissioners-The Board of Commissioners of Orange County, North Carolina. <br /> 2.1.7 County Manager-The Orange County employee bearing that title. <br /> 2.1.8 Milestone Dates—Those dates where certain results are expected. See Attachment D. <br /> 2.1.9 Project-All phases of the Project as described in Section 1.1.1 and Attachments A and B including but not <br /> limited to the schematic design,design development, construction document, bidding and contract award,construction <br /> and post-construction phases. <br /> 2.1.10 Reimbursable Expenses—Those costs incurred by the Designer for the benefit of this project and which the <br /> County will pay. See Section 7.5. <br /> 2.1.11 Total Project Cost—The total amount of money which maybe paid for services on this project.See Section 4.2.1. <br /> ARTICLE 3 <br /> RESPONSIBILITIES OF THE DESIGNER <br /> 3.1 Services to be Provided. <br /> 3,1.1 The Designer shall provide the Owner with a I I professional services required to satisfactorily complete all phases <br /> of the Project within the time limitations set forth herein and in accordance with the highest professional standards. <br /> Such services are as shown in Attachment B,the description of services. <br /> AEI services of the Designer shall be provided in accordance with the terms and conditions of this Agreement. <br /> 2 <br /> Revised 11/19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.