Browse
Search
EDD Task Force agenda 121800
OrangeCountyNC
>
BOCC Archives
>
Advisory Boards and Work Groups - Inactive
>
EDD Task Force
>
EDD Task Force agenda 121800
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 12:05:47 PM
Creation date
2/5/2020 11:41:23 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 3 . Amend Section 3 . 5 . 2 to add the provisions for the Entranceway Special Use District <br /> as follows . <br /> Entranceway Sp . Use <br /> Minimum Lot Area 4 ac 2 ac2 <br /> Minimum Lot Width (in feet) 200 ac 1002 <br /> Minimum Side Yard Width (in feet) 20 ' <br /> Minimum Rear Yard Width (in feet) 201 <br /> Minimum Front Setback (in feet) 50 ' <br /> Maximum Impervious surface (percent of gross lot) 50 % <br /> Maximum Building Height (in feet) 60 <br /> ' or height of the building whichever is greater <br /> 2 if part of a master plan rezoning <br /> Section 4 . Add Sections 4 . 38 — 4 . 48 as follows : <br /> 4 . 38 Special Use Permit Intent <br /> Special Uses ( SU) because of their inherent nature , extent of development, or external <br /> effects , require special care in the control of their location, design and methods of operation, <br /> in order to insure protection of the public health, safety and welfare . <br /> It is the intent of this Section to set forth the additional information required for submittal <br /> and consideration of SU and to state the standards by which each application shall be <br /> judged . <br /> Special Use Permits are submitted simultaneously with a rezoning request to a Special Use <br /> District. Hearings on both matters are held concurrently . The Board of Commissioners <br /> must act on the rezoning request before it acts on the permit request . If the rezoning request <br /> is denied, the permit request is moot. <br /> 4 . 39 General Standards and Findings of Fact <br /> 4 . 391 Subject to 4 . 39 . 2 , the Board of Commissioners shall issue the requested permit unless it <br /> concludes , based upon the information submitted at the hearing that : <br /> a) The requested permit is not within its jurisdiction according to the Table of Permissible <br /> Uses , or <br /> b) The application is incomplete , or <br /> c) If complete as proposed in the application the development will not comply with one or <br /> more requirements of this chapter (not including those the applicant is not required to <br /> comply with under the circumstances specified in Non- Conformities) <br /> 4 . 39 . 2 Even if the permit-issuing boards finds that the application complies . with all other <br /> provisions of this chapter, it may still deny the permit if it concludes , based upon the <br /> information submitted at the hearing , that if completed as proposed , the development, more <br /> probably that not : <br /> a) Will materially endanger the public health or safety , or <br /> b) Will substantially injure the value of adjoining or abutting property, or <br /> g :\craig\edd\entrancesud\ 12=4-00\dg <br />
The URL can be used to link to this page
Your browser does not support the video tag.