Orange County NC Website
ASSUMPTION <br /> Water / sewer south of I - 40 will put pressure on New Hope - I40 to <br /> develop <br /> Approval of I - 40 / 01d 86 will relieve pressure on New Hope <br /> Water / sewer under I - 40 will promote dense growth into the rural <br /> buffer <br /> Growth into the rural buffer will come from the south <br /> Cannot control growth long - term through zoning <br /> a <br /> Ridge line is natural barrier to growth <br />