Browse
Search
Agenda - 05-15-2001-9e
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2001
>
Agenda - 05-15-2001
>
Agenda - 05-15-2001-9e
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/1/2008 11:03:02 PM
Creation date
8/29/2008 10:32:02 AM
Metadata
Fields
Template:
BOCC
Date
5/15/2001
Document Type
Agenda
Agenda Item
9e
Document Relationships
Minutes - 05-15-2001
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2001
NS RES-2001-061 Resolution Establishing Rules and Regulations for the Operation of a Sewer Collection Treatment System to Serve the Efland Area
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27 <br />System is extended will be served by a public water <br />system; <br />III. Issues to be addressed related to public water systems <br />providing public water to homes served by a System <br />extension include: <br />A. consistency with State law regarding interbasin <br />transfers; <br />B. Eno River Capacity Use Agreement review; <br />C. the .extent and the impact of augmenting surface water <br />supply with large capacity wells; <br />D. the existence of a State approved water supply plan <br />for the public water supply system; <br />E, to the extent it can reasonably be determined, the <br />impact on ground water resources including recharge <br />capabilities of ground water resources in the area of <br />public water supply system wells augmenting surface <br />water supply; <br />F, the following issues with respect to the Orange <br />Alamance Water System: <br />1. Land Use and Zoning: OAWS plans to coordinate its <br />efforts with Orange County Land Use Plan, Zoning <br />Regulations and Efland Area Sewer System Rules, <br />2. Master Plan - Long Range System Plan and Design <br />a. Status of State action on Water Supply Plan. <br />
The URL can be used to link to this page
Your browser does not support the video tag.